Updates:
Site Work/Mechanical Yard:
●Footings/foundation at the Softball, Baseball Field
●Setting the generators into place
Athletics/Pool:
●Track Handrail Shoe
●Locker being placed in the PE Locker Rooms
●Pool painting
●Window caulking
Administration/Commons:
●Level 3 framing
●Level 1 slab on grade pour
●Prepping slab on grade in the Public Square/Dining
Academics/Social Studies:
●Framing of classrooms and display cases
●Drywall around the skylights
●Frames and glazing on the stair tower
●Finish paint on Levels 2 and 3
Performing Arts:
●Curtain wall and glazing around the Lobby