• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

All Updates

Skyline High School Final Anticipated Site Layout

May 2019

After over 9 months of working with the greater Millcreek community, evaluating over 3,000 comments from a community survey, conducting an extensive traffic study and working closely with the Skyline High Community Council, the District is pleased to release a site layout for the new Skyline High School.

This is a final product of over 40 different layouts that the design team evaluated based on the significant site limitations present that make this rebuild a challenge. We recognize that there is never a perfect product that meets everyone’s expectations, but hope that our community will recognize the tremendous effort that was made to listen to and implement the feedback that was provided.

While interior design work will continue, we expect that Phase 1 will begin in the next few weeks. We will post an anticipated construction time line as soon as that has been finalized.

Thanks for your patience and support as we continue to work to develop and construct a 21st Century High School that will help our students prepare for college and/or a career and be an ongoing asset to this community.

Site Limitations:

  • Small campus of just over 40 acres. We prefer campus size to be around 60 acres on a rebuild to be able to maintain the current building for use while the new facility is under construction. This saves taxpayers money.
  • A multi-phase rebuild schedule will be used so that students are not displaced and can safely attend school while the new building is constructed. You can see the current buildings on the layout are the shaded portions. We anticipate posting an animated description of these construction phases in the coming weeks.
  • Elevation changes are significant from the East to West of this campus.
  • Metro Water has a large pipeline that runs North to South just East (marked with dashes on the image) of the current stadium and classroom building. This is their property and we are unable to construct permanent structures on that section of the campus.
  • Adjusting the necessary amount of parking to accommodate and enhance traffic patterns in the neighboring area.

Please look for additional information in the coming weeks regarding the construction timeline.

Filed Under: Project Updates, Skyline

Contractor Awarded for South Kearns, Roosevelt

March 2019

Jacobsen Construction has been awarded the contract for both South Kearns Elementary and Roosevelt Elementary rebuild projects.

The two schools will be sister schools, meaning the overall structures, floor plans, and facades will be nearly identical. Each school will have two maker space labs and two special education suites in addition to standard classrooms.

Roll-up glass doors and flexible furniture will allow for student collaboration and an easily transformable learning environment.

Security is a major focus of both buildings, and several layers of protection will be used to help keep the schools as safe as possible.

Roosevelt Elementary Rendering
Roosevelt Elementary Site Plan

 

South Kearns Elementary Rendering
South Kearns Elementary Site Plan
Building Facades
Hallway Space
Classroom Space

Filed Under: Project Updates

Cyprus/Skyline Architectural Preferences

January 2019

Design plans for Cyprus High School and Skyline High School will be finalized in the coming months, and we’re getting a clearer picture of the architectural aesthetics of the new buildings.

This photo gallery is a sample of architectural preferences regarding the overall ‘look’ of the new high schools. Please note these are only examples that demonstrate preferred aesthetics, not actual renderings of either building.

These preferences are the result of a focus group with parent advisory committees and community leaders. The images represent some of the designs that resonated most with participants. The architectural design team will take  this information into consideration as they work to finalize plans.

Filed Under: Project Updates

Contractor Awarded for Hunter Wing, Construction to Begin in Spring

January 2019

The Granite Board of Education recently approved Bud Mahas Construction as general contractor for the Hunter High School wing addition.

Construction will commence on the site in the spring, with the full project scheduled to be completed summer 2020.

The wing will include several classrooms, student collaboration spaces, maker spaces, conference rooms, learning labs, faculty areas, and storage space. The increased building capacity will alleviate the need for portable classrooms currently on the campus.

Filed Under: Project Updates

Project Status Timeline

December 2018

Here you can view the current status of all major capital projects in Granite School District, including completed work, current projects, and future construction dates.

SchoolProjectStatus
Valley Jr. HighMajor RemodelIn Use; Full Completion December 2018
Evergreen Jr. HighMajor RemodelIn Use; Full Completion December 2018
Granite Technical Institute5th Floor ExpanisionIn Use; Full Completion December 2018
Olene Walker ElementaryRebuild of Roosevelt ElementaryConstruction Complete Fall 2020
South Kearns ElementaryRebuildConstruction Complete Fall 2020
Hunter High SchoolWing AdditionConstruction Set to Complete 2021
Rosecrest ElementaryMajor RemodelIn Use; Completed 2019
Howard Driggs ElementaryMajor RemodelIn Use; Completed 2019
Cyprus High SchoolRebuildConstruction Begins 2020
Skyline High SchoolRebuildConstruction Begins 2020
West Kearns ElementaryRebuildArchitectural Design Work; Construction Scheduled to Begin 2020
Calvin Smith ElementaryMajor RemodelConstruction Scheduled to Begin 2021
Plymouth ElementaryMajor RemodelConstruction Scheduled to Begin 2021
Moss ElementaryMajor RemodelConstruction Scheduled to Begin 2021
Arcadia ElementaryRebuildConstruction Scheduled to Begin 2022
Taylorsville High SchoolWing AdditionConstruction Scheduled to Begin 2022
Orchard ElementaryRebuildConstruction Scheduled to Begin 2023
Kennedy Jr. HighMajor RemodelConstruction Scheduled to Begin 2023
Hillsdale ElementaryMajor RemodelConstruction Scheduled to Begin 2023
Academy Park ElementaryRebuildConstruction Scheduled to Begin 2024
Kearns Jr. HighRebuildConstruction Scheduled to Begin 2024
Magna ElementaryMajor RemodelConstruction Scheduled to Begin 2024
Valley Crest ElementaryMajor RemodelConstruction Scheduled to Begin 2024
Sandburg ElementaryRebuildConstruction Scheduled to Begin 2025
Pioneer ElementaryMajor RemodelConstruction Scheduled to Begin 2025
Lincoln ElementaryMajor RemodelConstruction Scheduled to Begin 2025
Eastwood ElementaryRebuildConstruction Scheduled to Begin 2026
Crestview ElementaryMajor RemodelConstruction Scheduled to Begin 2026
Spring Lane ElementaryRebuildConstruction Scheduled to Begin 2027
Cottonwood ElementaryMajor RemodelConstruction Scheduled to Begin 2027
Oakridge ElementaryRebuildConstruction Scheduled to Begin 2028
Valley Jr. HighRebuildConstruction Scheduled to Begin 2028
Evergreen Jr. HighRebuildConstruction Scheduled to Begin 2028

Filed Under: Project Updates

First Issuance of Bonds Receives AAA Rating

November 2018

The first issuance of $50,000,000 General Obligation School Building Bonds has been given the highest rating by Fitch Ratings, reflecting the district’s “solid financial operations, flexible labor environment and low liability burden.”

This first issuance will be used for a variety of purposes, from design work to construction contracts. Read the full Fitch Ratings report:

Granite School District New Issue Report

Filed Under: Feature

WATCH: Valley Junior High Cuts the Ribbon to Newly Remodeled Building

September 2018

Students and staff at Valley Junior High were pleased to welcome families, residents, dignitaries, and elected officials to tour the newly remodeled building.

Filed Under: Feature

August Update: Project Photos & Contracts

August 2018

Remodel projects at Evergreen Jr. High, Valley Jr. High, and Granite Technical Institute are in the final stages of completion as we head into the new school year.

GTi principal pushes charis down hallway
Newly remodeled Valley Jr. High portion
Newly remodeled Valley Jr. High portion
Newly remodeled Valley Jr. High portion
Newly remodeled Valley Jr. High portion
Newly remodeled Valley Jr. High portion
Newly remodeled Valley Jr. High portion
Newly remodeled Evergreen Jr. High portion
Newly remodeled Evergreen Jr. High portion
Newly remodeled Evergreen Jr. High portion
Newly remodeled Evergreen Jr. High portion
Remodeled area of Granite Technical Institute
Remodeled area of Granite Technical Institute
Remodeled area of Granite Technical Institute
Remodeled area of Granite Technical Institute
Remodeled area of Granite Technical Institute

Other Project Updates:

A contract was awarded to Hughes General Contractors to be general contractor and construction manager for the Skyline High rebuild.

Elementary security upgrades continue throughout Granite School District. Upgrades at Morningside, Mill Creek, Lincoln, Farnsworth, Hillsdale, Arcadia, and Oquirrh Hills were recently completed, and construction at Fremont and Vista will begin soon.

Security upgrades will be included in 2018/2019 rebuild or remodel projects for the following schools: Howard Driggs, Rosecrest, South Kearns, and West Kearns.

Filed Under: Project UpdatesTagged With: elementary, evergreen, granite technical institute, junior high, security, skyline, skyline high school, upgrades, valley

Photos: GTI Remodel and Elementary Security Upgrades

June 2018

The Granite Technical Institute is expanding. As part of a major remodel, classrooms and lab spaces are being added to the fifth floor of the building, which was previously occupied by Utah State University.

Construction area in Granite Technical Institute
Construction area in Granite Technical Institute
Construction area in Granite Technical Institute
Construction area in Granite Technical Institute
Construction area in Granite Technical Institute
Construction area in Granite Technical Institute

Security upgrades are being installed at a number of elementary schools in the district. These upgrades involve remodeling main entry areas into secure entry systems with additional doors that can only be unlocked by office staff.

Lincoln main entry
Lincoln Elementary
Mill Creek main entry under construction
Mill Creek Elementary
Morningside main entry under construction
Morningside Elementary

Filed Under: Project Updates

Photos: Evergreen and Valley Remodels

June 2018

Remodel projects at Evergreen Jr. High and Valley Jr. High are progressing on schedule. These photos provide a small glimpse of the work being done.

Evergreen Jr. High:

Evergreen main office under construction
Evergreen gymnasium durng remodelling
Evergreen classroom under remodeling
Evergreen hallway during remodeling
Evergreen main entry during remodeling

Valley Jr. High:

Valley classroom during remodeling
Valley classroom during remodeling
Valley main office during remodeling
Valley main entry during remodeling
Valley classroom being remodeled

Filed Under: Project UpdatesTagged With: evergreen, photos, remodel, valley

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 14
  • Page 15
  • Page 16
  • Page 17
  • Page 18
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...