Updates:
- Administrative staff has moved in.
- Furniture and appliance delivery continues.
- We are moving in and setting up classrooms.
Academics
●ACM metal panels completed on exterior
●Student desks and chairs installed in all general classrooms
●Classroom moveable partitions nearing completion
●Flooring complete throughout building
●Final kitchen equipment being set
●Wall graphics in building completed
●All building furniture has been moved into the building
●Teacher pallets have been moved into the building
●Classroom AV equipment nearing completion
●Classroom relocatables complete in west parking lot
●Demolition of old Academics building about 50% complete
Site Work:
●Football field turf and running track
●Concrete walkways on the east side of the Baseball/Softball field
●Baseball field grading, infill, and fencing
●Roll up doors on the home side bleacher storage
Athletics/Pool:
●Slab on grade pour in the Pool
●Jumbotron and scoreboard installation
Administration/Commons:
●Learning Stairs framed for concrete pour
●Curtain wall/glazing around the Commons
●Metal panels on levels 2 and 3 of Administration
Academics/CTE:
●Masonry walls in the Manufacturing Shop
●Lab cabinetry
●Tile in the group restrooms
Performing Arts:
●Lighting in the Auditorium
●Lights in the Black Box Theater
Watch the presentation in the video below for updates about Granite School District construction projects. This presentation was given in the June 2024 Board of Education Meeting – Administrative Session. June 2024 Board of Education Capitol and Construction Update Slide Presentation.
Site Work:
● Stadium field base
● Stadium field fencing
● Stadium field drainage
● Flatwork behind home bleachers
Athletics/Pool:
● Track glass handrail
● Precast concrete benches in team locker rooms
● Pool plumbing
Administration/Commons:
● Framing in Administration
● Curtain wall/glazing around the Commons
● Testing Center siding
Academics/CTE:
● Finish paint, casework, and ceiling in Level 3 Academics
● Ceiling grid Levels 2 and 3 Academics
● Underground plumbing/electrical Manufacturing Shop
Performing Arts:
● Auditorium clouds finished
Academics
● LVT flooring nearing completion on the Main Level
● Pre-cast stairs installed on Main Staircase
● Site concrete in Courtyard being poured
● Student/teacher furniture being delivered and installed
● Ceiling tile dropped in all corridors
● Tile nearing completion throughout building
● All teacher material has been removed from the old Academics building and is being stored/moved into the new building
● Abatement of old building started June 3rd
● Casework nearing completion throughout all classrooms
● Manufacturing lab equipment being set
● Kitchen equipment installed