Status of Projects December 2023 – Skyline High School December 2023 Recent Pictures: Aerial photo of main Academics building, taken from the east. Stair tower steel progress where the Academics and the Performing Arts Buildings meet. Interior of the Athletics Vestibule. Lightson, ceiling tile being dropped. Hard lid ceilings being framed on level 2 outside of general classrooms. Walls are painted and walls ready for tile. Main Kitchen with tile on walls and hood equipment mounted on walls. Curtain wall glass being installed at north stair tower where Athletics and Academics connect. Skylights getting drywall hung on level 3. Teacher’s Lounge accent colorspainted, exterior door installed. Media Center walls framed and ready for drywall.