Updates:
- Roofing membrane is complete, waiting on metal flashing and wall caps to be completed
- Two Rooftop air handling units have been placed.
- Glass is being installed around the perimeter of the building.
- Installation of interior finishes such as tile and paint continue.
- Concrete floor in the auditorium has been placed.
- Millwork, overhead doors, and ceiling grids are being installed in the classrooms.
- Kitchen framing is complete and drywall has begun.