Updates:
Academics
- Activity Stair steel has started in the Cafeteria Space
- Curtain wall framing (Glass wall) has started around the exterior of the Cafeteria
- Accent wall paint has started throughout the building
- Tile is nearing completion in the Kitchen
- Tile has started in main corridors on Level 2
- Grid ceiling complete in Administration Suite
- Athletics Lobby is now open to public for use, with some finishes that still need completing
- Paint started on Level 3 of the main Academics Building
- Structure completed on the stair tower on south end of the main Academics building
Recent Pictures:
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-1.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-2.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-3.jpg)
the Cafeteria
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-4.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-5.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-6.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-7.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-8.jpg)
of the classroom groups on level 2
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-9.jpg)
installed in the Athletics Entrance
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-10.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/01/Skyline-11.jpg)