GSD Future

Long-Term Capital Outlook and Planning

  • Home
  • 2017 Bond Info
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Copyright 2023
Granite School District

Status of Projects August 2022 – Cyprus

August, 2022 by Granite Schools

Cyprus High School
Building Construction

Retaining wall work continues.
Geothermal drilling continues.
Auditorium tilt walls are being framed with structural steel.
Gymnasium and pool walls have been poured and will be stood into place by the first of August.

Foundation and orchestra pit walls
Foundation and orchestra pit walls
Geothermal drilling continues
Geothermal drilling continues
Steel trusses being delivered and stored on-site
Steel trusses being delivered and stored on-site
Steel door frames being delivered and stored on-site
Steel door frames being delivered and stored on-site
Retaining wall continues around front of site
Retaining wall continues around front of site

Filed Under: Cyprus, Project Updates

Status of Projects July 2022 – West Lake

July, 2022 by Granite Schools

West Lake STEM Junior High School Building Construction

Perimeter footings and foundations are 75% complete.
Approximately 20,000 sq. ft. of slab has been placed.

Concrete slab for Science classrooms
Concrete slab for Science classrooms
Footing and foundation walls for the commons area
Footing and foundation walls for the commons area
Underground pipes in locker rooms
Underground pipes in locker rooms
Fire protection line installation
Fire protection line installation
Interior footing excavation
Interior footing excavation

Filed Under: GEC

Status of Projects July 2022 – Cyprus

July, 2022 by Granite Schools

Cyprus High School Building Construction

More gymnasium tilt panels have been formed and poured
Pool foundation walls have been poured. Others are being formed
Auditorium foundation radius wall and orchestra pit back wall have been poured
Kitchen main underground electrical being installed for transformers and generators.
All crane paths have been installed.

About 30 insulated panels have been poured
About 30 insulated panels have been poured
About 30 insulated panels have been poured
About 30 insulated panels have been poured
Back wall orchestra pit
Back wall orchestra pit
Underground electrical
Underground electrical
Cyprus Campus
Cyprus Campus

Filed Under: GEC

Status of Projects June 2022 – West Lake

June, 2022 by Granite Schools

West Lake STEM Junior High School Building Construction

Continued placement of footings and foundations which are 40% complete.
Utilities, including plumbing drain lines, are 10% complete.
Electrical floor outlet installation is 10% complete.
Site storm drain is complete.
Fire and water lines have been tied into the existing Granger/Hunter Water Improvement District lines in the street.

Insulation on interior of foundation walls
Insulation on interior of foundation walls
Elevator pit in athletics wing
Elevator pit in athletics wing
Elevator pit in commons area
Elevator pit in commons area
Slab on grade in southwest academic wing
Slab on grade in southwest academic wing
Restroom drain lines in southwest academic wing
Restroom drain lines in southwest academic wing
Insulation on interior of foundation walls
Insulation on interior of foundation walls

Filed Under: Project Updates, West Lake

Status of Projects June 2022 – Skyline

June, 2022 by Granite Schools

Skyline High School
Athletics Complex & Academics Building

Mechanical, electrical, and plumbing continues throughout athletics building.
Pool equipment is energized and circulating water.
Flooring ongoing throughout athletics building.
Base is being placed at artificial turf field.
West concrete panel fencing is 85% complete.
Chain link fencing is ongoing at north property line.
Academics underground mechanical, electrical, and plumbing is being installed.
Salt Lake City Public Utilities water main is being sanitized for testing.
Softball backstop footings and fencing is underway.

Dance room finished floor
Dance room finished floor
Hallway south of gym
Hallway south of gym
Installation of wood floor at gym
Installation of wood floor at gym
Temporary mechanical for auditorium
Temporary mechanical for auditorium
West fence line at Laurel Crest
West fence line at Laurel Crest
West fence line/softball outfield fence
West fence line/softball outfield fence
Ramp north of main gym and south of tennis courts
Ramp north of main gym and south of tennis courts
West entrance to pool and field house
West entrance to pool and field house
Rock base being placed at turf field
Rock base being placed at turf field
Rock base being placed at turf field
Rock base being placed at turf field

Filed Under: Project Updates, Skyline

Status of Projects June 2022 – Cyprus

June, 2022 by Granite Schools

Cyprus High School
Building Construction

Tilt panels for gymnasium have been cast in concrete.
Pool foundation walls are complete.
Other foundation walls are being formed now and waiting for reinforcing steel.
Auditorium and stage walls have been formed, scheduled to pour 6/6/22
Underground electrical in kitchen area is being installed for transformers and generators.
All casting slabs for tilt walls are in place.
Crane and crane paths are in place, in preparation for standing tilt walls which is expected to begin late June.

Cyprus Campus
Cyprus Campus
Electrical conduits from transformers/generators
Electrical conduits from transformers/generators
Fire hydrant in mechanical yard
Fire hydrant in mechanical yard
Casting slab for tilt panels
Casting slab for tilt panels
Athletics and pool panels being prepped
Athletics and pool panels being prepped
Mockup panel
Mockup panel
Preparation for tilt panels
Preparation for tilt panels
Preparation for tilt panels
Preparation for tilt panels
Main underground electrical
Main underground electrical
Geothermal drilling, 80 holes have been drilled
Geothermal drilling, 80 holes have been drilled
Swimming pool area
Swimming pool area

Filed Under: Cyprus, Project Updates

Status of Projects May 2022 – West Lake

May, 2022 by Granite Schools

West Lake STEM Junior High School Building Construction

40% of excavation for footings has been completed.
Footings and foundation walls are in progress.
Storm water drainage system has begun.

East classroom wing footings
East classroom wing footings
East classroom wing mat footing
East classroom wing mat footing
Mat slab footings
Mat slab footings
Backfill and insulation of foundation wall
Backfill and insulation of foundation wall
Forming of south-east classroom wing foundation walls
Forming of south-east classroom wing foundation walls
Front office footing excavation
Front office footing excavation

Filed Under: Project Updates, West Lake

Status of Projects May 2022 – Skyline

May, 2022 by Granite Schools

Skyline High School Athletics Complex & Academics Building

Field Turf has commenced work on the synthetic turf field.
Forming walls at the Millcreek pedestrian staircase.
MEP finish work ongoing.
Main entrance storefront and doors installed.
Flooring has commenced in locker rooms, weight room, gymnasium, and dance room.
Site work continues at the playing fields.
Fencing continues at the west and north fence lines.
Pool has been drained, cleaned, and refilled. Pool deck is complete.
Training and commissioning of the pool scheduled for May.
Mechanical room work ongoing.

Skyline Campus

Millcreek stair
Millcreek stair
West property line retaining wall
West property line retaining wall
North property line utilities
North property line utilities
North property line looking east
North property line looking east
North property line looking west
North property line looking west
Turf field drainage
Turf field drainage
North fencing next to turf field
North fencing next to turf field
Weight room
Weight room
Dance room
Dance room
Skyline overview looking northwest
Skyline overview looking northwest
Skyline overview looking northeast
Skyline overview looking northeast
Floor being prepped in gym
Floor being prepped in gym
Team locker rooms
Team locker rooms

Filed Under: Project Updates, Skyline

Status of Projects May 2022 – Cyprus

May, 2022 by Granite Schools

Cyprus High School Building Construction

Athletics slab on grade has been poured for team locker rooms, wrestling room, coach’s offices, along with PE locker rooms.
Forming tilt-up walls. Setting rebar and electrical conduit and other embedded items.
Crane is on site, being assembled and crane paths have been installed.
Pool footings have been installed. Pool has been excavated and filled in with structural fill and made into a crane path for tilt panels.
Foundation walls being poured between pool and commons.
GeoEnergy drilling continues. 75 out of 200 holes drilled.
Academics footings have been installed.
Underground electrical being installed in orchestra area.
Underground plumbing is continuing in kitchen.
Retaining walls currently being installed along Cordero Drive are waiting on design from contractor.

Auto shop footings, hillside drainage finished
Auto shop footings, hillside drainage finished
Orchestra pit underground electrical
Orchestra pit underground electrical
Foundation walls and columns being formed up in pool area
Foundation walls and columns being formed up in pool area
View of site crane paths
View of site crane paths
Crane onsite being built
Crane onsite being built
Casting slabs, framing tilt walls, and crane paths
Casting slabs, framing tilt walls, and crane paths

Filed Under: Cyprus, Project Updates

Status of Projects April 2022 – West Lake

April, 2022 by Granite Schools

West Lake STEM Junior High School
Building Construction

Soil pad compaction under the building footprint is complete.
Excavation for underground utilities and footings has begun.
Reinforcing and forms placement for footings is in progress.
First footing concrete placement occurred 04/01/22.

Forms and reinforcing for footings
Forms and reinforcing for footings
Pouring footing for southwest corner area
Pouring footing for southwest corner area
Forms and reinforcement in progress
Forms and reinforcement in progress
Compacting soil for footings
Compacting soil for footings

Filed Under: Project Updates, West Lake