GSD Future

Long-Term Capital Outlook and Planning

  • Home
  • 2017 Bond Info
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Copyright 2023
Granite School District

Status of Projects April 2022 – Skyline

April, 2022 by Granite Schools

Skyline High School
Athletics Complex & Academics Building

New pool has been filled and is circulating water.
Existing pool was drained and is being tested for asbestos and abatement.
Boilers are operational and air handling units are providing warm air.
Gymnasium floor has been acclimating to building temperature and humidity.
Field Turf mobilized the week of 04/04/22.
Tiling at bathrooms and pool is ongoing.
Site work continues, including perimeter and athletic field fencing.

Tile work progressing in locker room
Tile work progressing in locker room
Grading for turf field
Grading for turf field
Fencing posts next to turf field
Fencing posts next to turf field
New pool circulating water
New pool circulating water
Hardwood flooring acclimatizing
Hardwood flooring acclimatizing
Sidewalk at tennis court retaining wall
Sidewalk at tennis court retaining wall
Lockers being installed in locker room
Lockers being installed in locker room

Filed Under: Project Updates, Skyline

Status of Projects April 2022 – Cyprus

April, 2022 by Granite Schools

Cyprus High School
Building Construction

Gymnasium slab on grade is being poured for locker rooms, wrestling room, coaches’ offices, along with PE locker rooms.
Framing up tilt walls, prepping for rebar and electrical construction. Tilt walls concrete pouring to begin 04/11/22.
Pool footing has been installed, excavated and filled in with structural fill dirt and made into a crane path for tilt panels.
Geo Energy drilling will be ongoing for the next year.
Building footings have been installed, underground plumbing and electrical installation areongoing.
Retaining walls are currently being installed along Cordero Drive.

Casting slabs, framing tilt walls and crane paths
Casting slabs, framing tilt walls and crane paths
Site overview
Site overview
Site overview
Site overview
Orchestra pit footings
Orchestra pit footings
Retaining wall
Retaining wall
Retaining wall
Retaining wall
Casting slabs, framing tilt walls and crane paths
Casting slabs, framing tilt walls and crane paths

Filed Under: Cyprus, Project Updates

Status of Projects March 2022 – West Lake

March, 2022 by Granite Schools

West Lake STEM Junior High School Building Construction

Removing remaining grass and parking lot asphalt in building footprint.

construction site
construction site
construction site
construction site
Hogan trailer onsite
Hogan trailer onsite

Filed Under: Project Updates

Status of Projects March 2022 – Skyline

March, 2022 by Granite Schools

Skyline High School Athletics Complex & Academics Building

Finishing tile work in locker rooms, lockers onsite.
Start up of air handlers has begun, boilers to be started first week of March.
Earthwork continues on athletic fields.
Retaining walls and fences on north and west property lines are under way.
Foundation poured for softball press box.
Footings have been formed for the east wall of the academics building.
Metal siding is being installed on the mechanical penthouse.
Pool lining is being installed.

Softball concessions footings
Softball concessions footings
Footing and foundation wall for academics
Footing and foundation wall for academics
Fieldhouse scoreboard
Fieldhouse scoreboard
Coach’s office millwork
Coach’s office millwork
pool
pool
Temporary fencing in place as preparation for new fence / wall occurs
Temporary fencing in place as preparation for new fence / wall occurs
Softball field dugout
Softball field dugout

Filed Under: Project Updates, Skyline

Status of Projects March 2022 – Cyprus

March, 2022 by Granite Schools

Cyprus High School Building Construction

Excavating orchestra pit.
Placing footings for automotive shops and kitchen areas.
Installing retaining wall along Cordero Drive.
Several casting slabs placed.
Framing tilt walls for athletics.
Installing drainage for southeast portion of lot.
Continuing with underground plumbing and electrical.

Casting slabs for tilt up wall construction
Casting slabs for tilt up wall construction
Material storage
Material storage
Material storage
Material storage
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Orchestra pit
Retaining wall
Retaining wall
Retaining wall
Retaining wall
Mockup panels for approval
Mockup panels for approval
Tilt walls framed, prepped for rebar and electrical
Tilt walls framed, prepped for rebar and electrical
Casting slabs for tilt up wall construction
Casting slabs for tilt up wall construction

Filed Under: Cyprus, Project Updates

Status of Projects February 2022 – West Lake

February, 2022 by Granite Schools

West Lake STEM Junior High School: School Design

Contract awarded to Hogan.
Pre-construction meeting with Hogan was01/24/22.
Perimeter security fencing installed and job trailer delivered to site on 1/28/22.
Groundbreaking – Concept to hold on March 18 – anniversary of earthquake.

Filed Under: Project Updates, West Lake

Status of Projects February 2022 – Skyline

February, 2022 by Granite Schools

Skyline High School: Athletics Complex

Backfilling around pool in progress.
Mechanical, plumbing, and fire sprinkler work ongoing.
Permanent electrical and gas services have been connected to the athletics building.
Installation of gym equipment has begun.
Tile work is progressing.
Site work, including footing excavation on the west side of the existing academic building, is underway for the new academic wing.
Work continues at the north athletic fields.
Asbestos surveys for the existing pool and auditorium/gymnasium buildings are almost complete.

Painted dance studio
Painted dance studio
Softball press box tilt panels
Softball press box tilt panels
Graded earthwork for the academic wing.
Graded earthwork for the academic wing.
Construction Sites
Construction Sites
Construction
Construction
Removed Cafeteria Section
Removed Cafeteria Section
Backfilling of the pool
Backfilling of the pool

Filed Under: Project Updates, Skyline

Status of Projects February 2022 – Cyprus

February, 2022 by Granite Schools

Cyprus High School: Building Construction

Continuing underground plumbing and underground electrical.
Concrete footings continue to be poured.
Casting slabs have been placed so precast walls can be formed and poured.
Drilling of heat source wells has begun.

Cyprus footing / foundation & underground utility construction

Casting slab where walls will
be formed and poured
Casting slab where walls will
be formed and poured
Construction site
Construction site
Mockup panels for review and approval
Mockup panels for review and approval
Mockup panels for review and approval
Mockup panels for review and approval
Plumbing wall of cafeteria kitchen
Plumbing wall of cafeteria kitchen
Plumbing wall of cafeteria kitchen
Plumbing wall of cafeteria kitchen

Filed Under: Cyprus, Project Updates

Status of Projects January 2022 – West Lake

January, 2022 by Granite Schools

West Lake STEM Junior High School
School Design

Documents have gone out for bid.
Contractor bids due Thursday, January 6, 2022.

Filed Under: Project Updates, West Lake

Status of Projects January 2022 – Skyline

January, 2022 by Granite Schools

Skyline High School – Athletics Complex

Mount Olympus sewer main work at north property line complete.
MEP continues throughout building.
Tile work is ongoing in all locker rooms.
Boiler room work ongoing.
Dominion Energy installing the gas main to the building.
Rocky Mountain Power installing the main electrical service.
Swimming pool excavation complete. Installation underway.
Work in weight room and dance studio continues.

Weight Room
Weight Room
Dance Studio
Dance Studio
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus Construction
Skyline Campus
Skyline Campus

Filed Under: Project Updates, Skyline