GSD Future

Long-Term Capital Outlook and Planning

  • Home
  • 2017 Bond Info
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Copyright 2023
Granite School District

Status of Projects June 2022 – West Lake

June, 2022 by Granite Schools

West Lake STEM Junior High School Building Construction

Continued placement of footings and foundations which are 40% complete.
Utilities, including plumbing drain lines, are 10% complete.
Electrical floor outlet installation is 10% complete.
Site storm drain is complete.
Fire and water lines have been tied into the existing Granger/Hunter Water Improvement District lines in the street.

Insulation on interior of foundation walls
Insulation on interior of foundation walls
Elevator pit in athletics wing
Elevator pit in athletics wing
Elevator pit in commons area
Elevator pit in commons area
Slab on grade in southwest academic wing
Slab on grade in southwest academic wing
Restroom drain lines in southwest academic wing
Restroom drain lines in southwest academic wing
Insulation on interior of foundation walls
Insulation on interior of foundation walls

Filed Under: Project Updates, West Lake

 