GSD Future

Long-Term Capital Outlook and Planning

  • Home
  • 2017 Bond Info
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Copyright 2023
Granite School District

Status of Projects June 2022 – Cyprus

June, 2022 by Granite Schools

Cyprus High School
Building Construction

Tilt panels for gymnasium have been cast in concrete.
Pool foundation walls are complete.
Other foundation walls are being formed now and waiting for reinforcing steel.
Auditorium and stage walls have been formed, scheduled to pour 6/6/22
Underground electrical in kitchen area is being installed for transformers and generators.
All casting slabs for tilt walls are in place.
Crane and crane paths are in place, in preparation for standing tilt walls which is expected to begin late June.

Cyprus Campus
Cyprus Campus
Electrical conduits from transformers/generators
Electrical conduits from transformers/generators
Fire hydrant in mechanical yard
Fire hydrant in mechanical yard
Casting slab for tilt panels
Casting slab for tilt panels
Athletics and pool panels being prepped
Athletics and pool panels being prepped
Mockup panel
Mockup panel
Preparation for tilt panels
Preparation for tilt panels
Preparation for tilt panels
Preparation for tilt panels
Main underground electrical
Main underground electrical
Geothermal drilling, 80 holes have been drilled
Geothermal drilling, 80 holes have been drilled
Swimming pool area
Swimming pool area