West Lake STEM Junior High School Building Construction
40% of excavation for footings has been completed.
Footings and foundation walls are in progress.
Storm water drainage system has begun.
![East classroom wing footings](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-89-300x225.png)
![East classroom wing mat footing](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-88-300x163.png)
![Mat slab footings](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-87-300x222.png)
![Backfill and insulation of foundation wall](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-86-300x226.png)
![Forming of south-east classroom wing foundation walls](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-85-300x225.png)
![Front office footing excavation](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-84-300x223.png)
West Lake STEM Junior High School Building Construction
40% of excavation for footings has been completed.
Footings and foundation walls are in progress.
Storm water drainage system has begun.