Cyprus High School: Building Construction
Continuing underground plumbing and underground electrical.
Concrete footings continue to be poured.
Casting slabs have been placed so precast walls can be formed and poured.
Drilling of heat source wells has begun.
Cyprus footing / foundation & underground utility construction
![Casting slab where walls will
be formed and poured](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-81-300x226.png)
be formed and poured
![Construction site](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-82-300x169.png)
![Mockup panels for review and approval](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-80-300x225.png)
![Mockup panels for review and approval](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-79-300x225.png)
![Plumbing wall of cafeteria kitchen](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-78-300x169.png)
![Plumbing wall of cafeteria kitchen](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-77-300x225.png)