Updates:
- The three Academic wings have cabinetry, ceiling grid, electrical, and mechanical systems in place
- The Administration wing has been painted and ceiling grid installation is in progress.
- The CTE wing has interior windows installed and ceiling grid installation is in progress.
- Wall tile in corridors and restrooms is 85% complete.
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-1.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-2.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-3.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-4.jpg)
Auditorium ceiling
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-5.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-6.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2024/02/West-Lake-7.jpg)