• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Status of Projects August 2022 – West Lake

August 2022

West Lake STEM Junior High School
Building Construction

Parking lot is being prepped to move cars off the street.
Perimeter footings are 95% complete and interior footings are 85% complete.
Approximately 26,000 sq ft of slab on grade has been placed.
Structural steel on south-west classroom wing being erected.

Footings
Footings
Floor slab for teacher’s common area
Floor slab for teacher’s common area
North parking lot curb & gutter
North parking lot curb & gutter
North parking lot curb & gutter
North parking lot curb & gutter
Structural steel framing being erected
Structural steel framing being erected
Structural steel framing being erected
Structural steel framing being erected

Filed Under: Project Updates, West Lake

Status of Projects August 2022 – Skyline

August 2022

Skyline High School
Athletics Complex

Owner training is ongoing for all systems.
Turf field to be turned over on July 25, the school can start using August 1.
Grading continues at softball field, grass field, tennis courts, and west fence line.
Sod for softball field expected in September.
Bleacher installation is ongoing.
Granite security, AV, and IT installations are ongoing.
Old pool building demolition is complete.
Track installation is complete.

Academic footings
Academic footings
Academic footings
Academic footings
Existing pool demolition
Existing pool demolition
Grading at tennis court
Grading at tennis court
Indoor track
Indoor track
Indoor track
Indoor track
Bleachers in fieldhouse
Bleachers in fieldhouse
Playfields
Playfields
Playfields
Playfields
Locker room
Locker room
Accessible shower
Accessible shower
Coach offices
Coach offices

Filed Under: Project Updates, Skyline

Status of Projects August 2022 – Cyprus

August 2022

Cyprus High School
Building Construction

Retaining wall work continues.
Geothermal drilling continues.
Auditorium tilt walls are being framed with structural steel.
Gymnasium and pool walls have been poured and will be stood into place by the first of August.

Foundation and orchestra pit walls
Foundation and orchestra pit walls
Geothermal drilling continues
Geothermal drilling continues
Steel trusses being delivered and stored on-site
Steel trusses being delivered and stored on-site
Steel door frames being delivered and stored on-site
Steel door frames being delivered and stored on-site
Retaining wall continues around front of site
Retaining wall continues around front of site

Filed Under: Cyprus, Project Updates

July 2022 Construction Photos

July 2022

Granite Technical Institute – Pharmacy and Animation Labs

Granite Technical Institute construction area
Granite Technical Institute construction area
Granite Technical Institute construction area

Cyprus High School

Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site

Skyline High School

Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site

West Lake STEM Jr High

West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site

Filed Under: Cyprus, Skyline, West Lake

Status of Projects July 2022 – West Lake

July 2022

West Lake STEM Junior High School Building Construction

Perimeter footings and foundations are 75% complete.
Approximately 20,000 sq. ft. of slab has been placed.

Concrete slab for Science classrooms
Concrete slab for Science classrooms
Footing and foundation walls for the commons area
Footing and foundation walls for the commons area
Underground pipes in locker rooms
Underground pipes in locker rooms
Fire protection line installation
Fire protection line installation
Interior footing excavation
Interior footing excavation

Filed Under: GEC

Status of Projects July 2022 – Cyprus

July 2022

Cyprus High School Building Construction

More gymnasium tilt panels have been formed and poured
Pool foundation walls have been poured. Others are being formed
Auditorium foundation radius wall and orchestra pit back wall have been poured
Kitchen main underground electrical being installed for transformers and generators.
All crane paths have been installed.

About 30 insulated panels have been poured
About 30 insulated panels have been poured
About 30 insulated panels have been poured
About 30 insulated panels have been poured
Back wall orchestra pit
Back wall orchestra pit
Underground electrical
Underground electrical
Cyprus Campus
Cyprus Campus

Filed Under: GEC

June 2022 Construction Photos

June 2022

Cyprus High School

Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site

Skyline High School

Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site

West Lake STEM Junior High

West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site

Filed Under: Cyprus, Skyline, West Lake

Status of Projects June 2022 – West Lake

June 2022

West Lake STEM Junior High School Building Construction

Continued placement of footings and foundations which are 40% complete.
Utilities, including plumbing drain lines, are 10% complete.
Electrical floor outlet installation is 10% complete.
Site storm drain is complete.
Fire and water lines have been tied into the existing Granger/Hunter Water Improvement District lines in the street.

Insulation on interior of foundation walls
Insulation on interior of foundation walls
Elevator pit in athletics wing
Elevator pit in athletics wing
Elevator pit in commons area
Elevator pit in commons area
Slab on grade in southwest academic wing
Slab on grade in southwest academic wing
Restroom drain lines in southwest academic wing
Restroom drain lines in southwest academic wing
Insulation on interior of foundation walls
Insulation on interior of foundation walls

Filed Under: Project Updates, West Lake

Status of Projects June 2022 – Skyline

June 2022

Skyline High School
Athletics Complex & Academics Building

Mechanical, electrical, and plumbing continues throughout athletics building.
Pool equipment is energized and circulating water.
Flooring ongoing throughout athletics building.
Base is being placed at artificial turf field.
West concrete panel fencing is 85% complete.
Chain link fencing is ongoing at north property line.
Academics underground mechanical, electrical, and plumbing is being installed.
Salt Lake City Public Utilities water main is being sanitized for testing.
Softball backstop footings and fencing is underway.

Dance room finished floor
Dance room finished floor
Hallway south of gym
Hallway south of gym
Installation of wood floor at gym
Installation of wood floor at gym
Temporary mechanical for auditorium
Temporary mechanical for auditorium
West fence line at Laurel Crest
West fence line at Laurel Crest
West fence line/softball outfield fence
West fence line/softball outfield fence
Ramp north of main gym and south of tennis courts
Ramp north of main gym and south of tennis courts
West entrance to pool and field house
West entrance to pool and field house
Rock base being placed at turf field
Rock base being placed at turf field
Rock base being placed at turf field
Rock base being placed at turf field

Filed Under: Project Updates, Skyline

Status of Projects June 2022 – Cyprus

June 2022

Cyprus High School
Building Construction

Tilt panels for gymnasium have been cast in concrete.
Pool foundation walls are complete.
Other foundation walls are being formed now and waiting for reinforcing steel.
Auditorium and stage walls have been formed, scheduled to pour 6/6/22
Underground electrical in kitchen area is being installed for transformers and generators.
All casting slabs for tilt walls are in place.
Crane and crane paths are in place, in preparation for standing tilt walls which is expected to begin late June.

Cyprus Campus
Cyprus Campus
Electrical conduits from transformers/generators
Electrical conduits from transformers/generators
Fire hydrant in mechanical yard
Fire hydrant in mechanical yard
Casting slab for tilt panels
Casting slab for tilt panels
Athletics and pool panels being prepped
Athletics and pool panels being prepped
Mockup panel
Mockup panel
Preparation for tilt panels
Preparation for tilt panels
Preparation for tilt panels
Preparation for tilt panels
Main underground electrical
Main underground electrical
Geothermal drilling, 80 holes have been drilled
Geothermal drilling, 80 holes have been drilled
Swimming pool area
Swimming pool area

Filed Under: Cyprus, Project Updates

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • Page 11
  • Interim pages omitted …
  • Page 18
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...