• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Kearns Elementary
  • All Updates
  • Phase 1 Project List

Status of Projects October 2022 – Cyprus

October 2022

Cyprus High School: Site Preparation

Site preparation is 100% complete.
Mass grading has been completed.
Kennecott site storm water drainage redirection project is completed.

Cyprus Site Work
Cyprus Site Work
Cyprus Site Work
Cyprus Site Work

Cyprus High School: Building Construction

Purchase order was issued to Westland Construction for construction of the new Cyprus High School.
Notice to proceed issued 09/13/2021.
Excavation of footings has begun.

Cyprus Footings
Cyprus Footings
Cyprus Footings
Cyprus Footings

Filed Under: Cyprus, Project Updates

August 2022 Construction Photos

August 2022

Cyprus High School

Cyprus High construction site
Cyprus High construction site
Cyprus High construction site
Cyprus High construction site
Cyprus High construction site

Skyline High School

Skyline High construction site
Skyline High construction site
Skyline High construction site
Skyline High construction site
Skyline High construction site

West Lake STEM Junior High

West Lake Junior High construction site
West Lake Junior High construction site
West Lake Junior High construction site
West Lake Junior High construction site
West Lake Junior High construction site

Cottonwood High Auditorium Control Booth

Cottonwood High control booth construction
Cottonwood High control booth construction
Cottonwood High control booth construction
Cottonwood High control booth construction

Granite Technical Institute Third Floor Labs

GTI 3rd floor lab construction
GTI 3rd floor lab construction
GTI 3rd floor lab construction
GTI 3rd floor lab construction

Security Upgrades

Hartvigsen security upgrade construction
Hartvigsen School
Hartvigsen security upgrade construction
Hartvigsen School
Rolling Meadows security upgrade construction
Rolling Meadows Elementary
Rolling Meadows security upgrade construction
Rolling Meadows Elementary
William Penn security upgrade construction
William Penn Elementary

Turf Fields

Granger High turf field replacement
Granger High School
Granger High turf field replacement
Granger High School
Taylorsville High turf field replacement
Taylorsville High School
Taylorsville High turf field replacement
Taylorsville High School
Taylorsville High turf field replacement
Taylorsville High School

Filed Under: Cyprus, Project Updates, Skyline, West Lake

Status of Projects August 2022 – West Lake

August 2022

West Lake STEM Junior High School
Building Construction

Parking lot is being prepped to move cars off the street.
Perimeter footings are 95% complete and interior footings are 85% complete.
Approximately 26,000 sq ft of slab on grade has been placed.
Structural steel on south-west classroom wing being erected.

Footings
Footings
Floor slab for teacher’s common area
Floor slab for teacher’s common area
North parking lot curb & gutter
North parking lot curb & gutter
North parking lot curb & gutter
North parking lot curb & gutter
Structural steel framing being erected
Structural steel framing being erected
Structural steel framing being erected
Structural steel framing being erected

Filed Under: Project Updates, West Lake

Status of Projects August 2022 – Skyline

August 2022

Skyline High School
Athletics Complex

Owner training is ongoing for all systems.
Turf field to be turned over on July 25, the school can start using August 1.
Grading continues at softball field, grass field, tennis courts, and west fence line.
Sod for softball field expected in September.
Bleacher installation is ongoing.
Granite security, AV, and IT installations are ongoing.
Old pool building demolition is complete.
Track installation is complete.

Academic footings
Academic footings
Academic footings
Academic footings
Existing pool demolition
Existing pool demolition
Grading at tennis court
Grading at tennis court
Indoor track
Indoor track
Indoor track
Indoor track
Bleachers in fieldhouse
Bleachers in fieldhouse
Playfields
Playfields
Playfields
Playfields
Locker room
Locker room
Accessible shower
Accessible shower
Coach offices
Coach offices

Filed Under: Project Updates, Skyline

Status of Projects August 2022 – Cyprus

August 2022

Cyprus High School
Building Construction

Retaining wall work continues.
Geothermal drilling continues.
Auditorium tilt walls are being framed with structural steel.
Gymnasium and pool walls have been poured and will be stood into place by the first of August.

Foundation and orchestra pit walls
Foundation and orchestra pit walls
Geothermal drilling continues
Geothermal drilling continues
Steel trusses being delivered and stored on-site
Steel trusses being delivered and stored on-site
Steel door frames being delivered and stored on-site
Steel door frames being delivered and stored on-site
Retaining wall continues around front of site
Retaining wall continues around front of site

Filed Under: Cyprus, Project Updates

July 2022 Construction Photos

July 2022

Granite Technical Institute – Pharmacy and Animation Labs

Granite Technical Institute construction area
Granite Technical Institute construction area
Granite Technical Institute construction area

Cyprus High School

Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site

Skyline High School

Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site

West Lake STEM Jr High

West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site

Filed Under: Cyprus, Skyline, West Lake

Status of Projects July 2022 – West Lake

July 2022

West Lake STEM Junior High School Building Construction

Perimeter footings and foundations are 75% complete.
Approximately 20,000 sq. ft. of slab has been placed.

Concrete slab for Science classrooms
Concrete slab for Science classrooms
Footing and foundation walls for the commons area
Footing and foundation walls for the commons area
Underground pipes in locker rooms
Underground pipes in locker rooms
Fire protection line installation
Fire protection line installation
Interior footing excavation
Interior footing excavation

Filed Under: GEC

Status of Projects July 2022 – Cyprus

July 2022

Cyprus High School Building Construction

More gymnasium tilt panels have been formed and poured
Pool foundation walls have been poured. Others are being formed
Auditorium foundation radius wall and orchestra pit back wall have been poured
Kitchen main underground electrical being installed for transformers and generators.
All crane paths have been installed.

About 30 insulated panels have been poured
About 30 insulated panels have been poured
About 30 insulated panels have been poured
About 30 insulated panels have been poured
Back wall orchestra pit
Back wall orchestra pit
Underground electrical
Underground electrical
Cyprus Campus
Cyprus Campus

Filed Under: GEC

June 2022 Construction Photos

June 2022

Cyprus High School

Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site
Cyprus High School construction site

Skyline High School

Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site
Skyline High School construction site

West Lake STEM Junior High

West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site
West Lake Jr High construction site

Filed Under: Cyprus, Skyline, West Lake

Status of Projects June 2022 – West Lake

June 2022

West Lake STEM Junior High School Building Construction

Continued placement of footings and foundations which are 40% complete.
Utilities, including plumbing drain lines, are 10% complete.
Electrical floor outlet installation is 10% complete.
Site storm drain is complete.
Fire and water lines have been tied into the existing Granger/Hunter Water Improvement District lines in the street.

Insulation on interior of foundation walls
Insulation on interior of foundation walls
Elevator pit in athletics wing
Elevator pit in athletics wing
Elevator pit in commons area
Elevator pit in commons area
Slab on grade in southwest academic wing
Slab on grade in southwest academic wing
Restroom drain lines in southwest academic wing
Restroom drain lines in southwest academic wing
Insulation on interior of foundation walls
Insulation on interior of foundation walls

Filed Under: Project Updates, West Lake

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 8
  • Page 9
  • Page 10
  • Page 11
  • Page 12
  • Interim pages omitted …
  • Page 19
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Kearns Elementary
  • All Updates
  • Phase 1 Project List


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2026 Granite School District

Loading Comments...