• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

January Update – Design Phase and Additional Projects

January 2018

Design Phase Update
Schools and district staff are working closely with architects to establish guidelines and imperatives for rebuilds and remodels.

Especially for Cyprus High and Skyline High, these imperatives are modeled on building flexibility. This means the structures will better support and accommodate functional change during the life of the building.

It also means flexibility in the delivery of education by being able to easily change the size and shape of various learning areas to meet the needs of students.

As a reminder, the design phase for an elementary school is approximately 10-12 months. For high schools, architectural design takes 18-24 months.

Approved architectural contracts:
Cyprus High – EVELATE, $3,715,030.90
Skyline High – ELEVATE, $3,821,800.00

Additional Projects
Although bond funds were not used for the following projects, the passing of the bond freed up capital funds to speed up the rate of smaller projects.

-Jardine Malaska Construction Services was awarded the bid ($392,975.00) for security upgrades at Bacchus Elementary, Copper Hills Elementary, Fox Hills Elementary, Hunter Elementary, Oquirrh Hills Elementary, and Calvin Smith Elementary.

Plans are being finalized for the next group of security upgrades, and are scheduled to go to bid in January. This group includes: Mill Creek Elementary, Morningside Elementary, Farnsworth Elementary, Arcadia Elementary, Hillside Elementary, and Lincoln Elementary.

-Fire alarm upgrades at Hunter Elementary and Calvin Smith Elementary (Modern Construction, $30,900.00)

-In-wall cafeteria table replacements: Academy Park Elementary, Cottonwood Elementary, Lake Ridge Elementary, Mill Creek Elementary, Sandburg Elementary, Taylorsville Elementary, Vista Elementary, and West Kearns Elementary (Jardine Malaska Construction Services, $92,826.00)

Filed Under: Project Updates

Thank You!

December 2017

The Granite School District Bond was approved by voters. Regardless of how you voted, we sincerely appreciate your support of Granite kids.

Filed Under: UncategorizedTagged With: 2017, ballot, bond, cyprus, election, granite bond, high school, initiative, pass, rebuild, remodel, revitalize, school, skyline, superintendent, support, thank you, vote, voter

Status of Projects July 2022 – Skyline

July 0201

Skyline High School Athletics Complex & Academics Building

Fencing continues at North property line.
Softball grading is almost complete.
Water main tie ins at Softball are complete.
MEP ongoing.
Main gymnasium wood floor is beginning to be sanded.
Auxiliary gym wood floor is being set. Interior corridor flooring ongoing.
Mechanical startups have commenced.
Abatement at old Aux Gym/Pool building complete.
Existing pool demo to start in July.

Gymnasium floor
Gymnasium floor
Interior hall floor
Interior hall floor
Practice turf field
Practice turf field
Light fixtures at pool atrium
Light fixtures at pool atrium
Demolition of old auxiliary gym and pool building
Demolition of old auxiliary gym and pool building
Softball field grading
Softball field grading

Filed Under: Project Updates, Skyline

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 16
  • Page 17
  • Page 18

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...