West Lake STEM J unior High School – Demolition / Site Preperation
- The demolition of the building is done
- Soils are being imported, compacted and site is being staged for construction.
- Soil compaction testing is being conducted and all tests so far have passed inspection.
West Lake Demolition
![West Lake Demolition](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-11-300x169.png)
![West Lake Demolition](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-12-300x189.png)
![West Lake Demolition](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-13-300x219.png)
![West Lake Demolition](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-14-300x168.png)
West Lake STEM Junior High School – Replacement
- Project is in design.
- 90% plan review was held on 12//03/2021.
- Request for Proposal has been issued fo contractors for pre-qualification.
- Bid release 11/29/2021.
![West Lake Site Plan map](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-15-300x194.png)
![First Floor map](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-16-300x214.png)
![Second Floor map](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-17-300x214.png)
![School diagram](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-18-300x129.png)
![west lake jhs replacement diagram](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/01/image-19-300x215.png)