• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Uncategorized

Cyprus High Construction Tour – March 2025

March 2025

Filed Under: Cyprus, Project Updates, Uncategorized

Taylorsville Network Projects Completed Since 2017

July 2023

Arcadia Elementary:

A freezer/cooler was added. The front office security project was completed. Carbon monoxide detectors were installed. The domestic water pipping was replaced. A partial re-roof project occurred. A special education relocation project was completed.

Bennion Elementary:

The fire alarm system was upgraded. The front office security remodel was completed. The HAVC air flow was upgraded. Some student drop-off modifications were completed.

Calvin Smith Elementary:

The front office security remodel was completed. The fire alarm was upgraded. The irrigation for the play fields was automated. An interior facelift happened. The HVAC controls were upgraded.

Fox Hills Elementary:

An interior facelift occurred. The front office security was completed. Carbon Monoxide detectors were installed. Playground turf was installed under the play structures. The air conditioning system was upgraded. A pedestrian bridge was added with associated site improvements. The HVAC controls were upgraded.

Fremont Elementary:

The front office security project was completed with an addition. Carbon Monoxide detectors were installed. The concrete columns under the school were shored up.

Taylorsville Elementary:

Kitchen and associated cooler box addition was completed. New in-wall cafeteria tables were added. Computer room change occurred.

Truman Elementary:

The front office security project was completed. The furnace and condenser were replaced. The HVAC system was upgraded.

Vista Elementary:

New in-wall cafeteria tables were added. The front office security project was completed with an addition. Carbon Monoxide detectors were installed. The irrigation for the play fields was automated.

Eisenhower Jr.:

The domestic water piping was redone. The auditorium audio system needed to be upgraded with a new system. New single-occupancy changing rooms were added. The south exterior wall was cleaned up so waterproofing could be applied the concrete wall. 

Bennion Jr.: 

The auditorium audio system was upgraded. The boiler was replaced. Significant earthquake repairs were performed. The fire panel was replaced for the fire alarm system and the HVAC controls were to be upgraded.

Taylorsville High:

The tennis courts were resurfaced and are being worked on again summer 2023. An auto shop lift was installed. Gymnasium bleachers were replaced. The softball home run fence was installed. The EPIC audio enhancement was installed. A main office remodel occurred. A new 16 room portable classroom unit was purchased and had all the necessary power, security, fire alarm and water/sewer connections. The baseball and softball dugouts were redone. A new chiller was purchased and installed. A new artificial turf replaced the old one. Four new relocatable classrooms have been installed. HVAC controls are being upgraded. Air conditioning addition to the main and auxiliary gymnasiums is underway.

Filed Under: Feature, Uncategorized

January 2022 Construction Photos

January 2022

Cyprus High School

Skyline High School

Oakridge Elementary Elevator Addition

Filed Under: Uncategorized

December 2021 Construction Photos

December 2021

Cyprus High School

Skyline High School

Filed Under: Uncategorized

Thank You!

December 2017

The Granite School District Bond was approved by voters. Regardless of how you voted, we sincerely appreciate your support of Granite kids.

Filed Under: UncategorizedTagged With: 2017, ballot, bond, cyprus, election, granite bond, high school, initiative, pass, rebuild, remodel, revitalize, school, skyline, superintendent, support, thank you, vote, voter

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...