Arcadia Elementary:
A freezer/cooler was added. The front office security project was completed. Carbon monoxide detectors were installed. The domestic water pipping was replaced. A partial re-roof project occurred. A special education relocation project was completed.
Bennion Elementary:
The fire alarm system was upgraded. The front office security remodel was completed. The HAVC air flow was upgraded. Some student drop-off modifications were completed.
Calvin Smith Elementary:
The front office security remodel was completed. The fire alarm was upgraded. The irrigation for the play fields was automated. An interior facelift happened. The HVAC controls were upgraded.
Fox Hills Elementary:
An interior facelift occurred. The front office security was completed. Carbon Monoxide detectors were installed. Playground turf was installed under the play structures. The air conditioning system was upgraded. A pedestrian bridge was added with associated site improvements. The HVAC controls were upgraded.
Fremont Elementary:
The front office security project was completed with an addition. Carbon Monoxide detectors were installed. The concrete columns under the school were shored up.
Taylorsville Elementary:
Kitchen and associated cooler box addition was completed. New in-wall cafeteria tables were added. Computer room change occurred.
Truman Elementary:
The front office security project was completed. The furnace and condenser were replaced. The HVAC system was upgraded.
Vista Elementary:
New in-wall cafeteria tables were added. The front office security project was completed with an addition. Carbon Monoxide detectors were installed. The irrigation for the play fields was automated.
Eisenhower Jr.:
The domestic water piping was redone. The auditorium audio system needed to be upgraded with a new system. New single-occupancy changing rooms were added. The south exterior wall was cleaned up so waterproofing could be applied the concrete wall.
Bennion Jr.:
The auditorium audio system was upgraded. The boiler was replaced. Significant earthquake repairs were performed. The fire panel was replaced for the fire alarm system and the HVAC controls were to be upgraded.
Taylorsville High:
The tennis courts were resurfaced and are being worked on again summer 2023. An auto shop lift was installed. Gymnasium bleachers were replaced. The softball home run fence was installed. The EPIC audio enhancement was installed. A main office remodel occurred. A new 16 room portable classroom unit was purchased and had all the necessary power, security, fire alarm and water/sewer connections. The baseball and softball dugouts were redone. A new chiller was purchased and installed. A new artificial turf replaced the old one. Four new relocatable classrooms have been installed. HVAC controls are being upgraded. Air conditioning addition to the main and auxiliary gymnasiums is underway.