• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Project Updates

Status of Projects January 2024 – Skyline High School

January 2024

Updates:

Academics

  • Activity Stair steel has started in the Cafeteria Space
  • Curtain wall framing (Glass wall) has started around the exterior of the Cafeteria
  • Accent wall paint has started throughout the building
  • Tile is nearing completion in the Kitchen
  • Tile has started in main corridors on Level 2
  • Grid ceiling complete in Administration Suite
  • Athletics Lobby is now open to public for use, with some finishes that still need completing
  • Paint started on Level 3 of the main Academics Building
  • Structure completed on the stair tower on south end of the main Academics building

Recent Pictures:

View of the west side of the main Academics Building
Glass being installed at the northwest stair tower of the main Academics Building
Steel being installed for main staircase in
the Cafeteria
Curtain wall framing being installed on the south side of the Cafeteria
Tile installed in Culinary Arts classroom on Level 1
Tile being installed in the serving area of the Cafeteria
Metal panels being installed on the north side of the main Academics Building
Large soffits being framed in outside
of the classroom groups on level 2
LVT Flooring as it was being
installed in the Athletics Entrance
Media Center walls insulated, ready for sheetrock
Kitchen being painted above the tile, getting ready for finish equipment

Filed Under: Skyline

Status of Projects January 2024 – Cyprus High School

January 2024

Updates:

Site Work:
● Fencing and flat work on the North side of the site

Athletics:
● Drops ceiling grid level 1 of athletics

Pool:
●Locker room framing, drywall and plumbing
●Tile in the lifeguard room

Mechanical Yard:
● Tilt walls stood in place
● Steel erection

CTE Buildings:
● Steel stud and metal decking on the breezeway

Academics:
● Paint and drywall 2nd and 3rd levels
● Exterior kiln walls stood into place
● Testing center cement poured

Social Studies:
● Curtain wall glass installation
● Drywall and insulation 2ndand 3rdfloor

Performing Arts:
● Vestibule curtain wall installation
● Concrete pour backs in the vestibule area

Recent Photos:

Fencing and flat work on the north side of the site
Drops ceiling grid level 1 of athletics
Locker room framing, drywall, and plumbing
Tile in the lifeguard room
Mechanical yard tilt walls stood in place, steel erection
Steel stud and metal decking on the breezeway
Paint and drywall 2nd and 3rd levels
Exterior kiln walls stood into place
Testing center cement poured
Curtain wall glass installation
Drywall and insulation 2nd and 3rd floor
Vestibule curtain wall installation
Concrete pour backs in the vestibule area

Filed Under: Cyprus

Status of Projects January 2024 – West Lake STEM

January 2024

Updates:

  • Glass installation at perimeter of building continues and is over 75% complete.
  • Installation of interior finishes such as tile, paint, and ceiling grid with light fixtures continues.
  • Final portion of interior slab on grade at north end of commons area has been placed.
Glass installation at building exterior
Insulation and decorative metal panels
Wall tile and painting in CTE wing
Pumps and piping in boiler room
Concrete slab in commons area

Filed Under: West Lake

Status of Projects December 2023 – West Lake STEM

December 2023

Updates:

  • Roofing membrane is complete, waiting on metal flashing and wall caps to be completed
  • Two Rooftop air handling units have been placed.
  • Glass is being installed around the perimeter of the building.
  • Installation of interior finishes such as tile and paint continue.
  • Concrete floor in the auditorium has been placed.
  • Millwork, overhead doors, and ceiling grids are being installed in the classrooms.
  • Kitchen framing is complete and drywall has begun.
Library and Teachers hub weathered in.
Front entrance looking East.
Auditorium slab has been placed.
Auditorium risers have been placed.
Kitchen framing complete.
Rooftop air handlers placed.

Filed Under: West Lake

Status of Projects December 2023 – Skyline High School

December 2023

Recent Pictures:

Aerial photo of main Academics building, taken from the east.
Stair tower steel progress where the Academics and the Performing Arts Buildings meet.
Interior of the Athletics Vestibule. Lights
on, ceiling tile being dropped.
Hard lid ceilings being framed on level 2 outside of general classrooms. Walls are painted and walls ready for tile.
Main Kitchen with tile on walls and hood equipment mounted on walls.
Curtain wall glass being installed at north stair tower where Athletics and Academics connect.
Skylights getting drywall hung on level 3.
Teacher’s Lounge accent colors
painted, exterior door installed.
Media Center walls framed and ready for drywall.

Filed Under: Skyline

Status of Projects December 2023 – Cyprus High School

December 2023

Updates:

Site Work:
● Asphalt paving Southwest parking lot

Athletics:
● Drop ceiling grid, light installation level 1
● 2ndlevel bathroom tile

Pool:
●Locker room framing, drywall and plumbing
●Acid etched glass installed

CTE Buildings:
● Tilt panels connecting CTE building with the main building 

Administration:
● Drywall 3rd and 4th floor

Cafeteria/Common Area:
● Skylight on the 3rd floor

Social Studies:
●Framing 3rd and 4th floor
●Rough electrical 3rd and 4th floor
●Air handler set on the 4th floor

Performing Arts:
● Fin tube heaters set into place
● Dressing room framing

Recent Photos:

Asphalt Southeast Parking lot
Drop ceiling grid
1st level restroom in athletics
Framing, drywall and plumbing in the locker room
Drywall 2nd and 3rd floor academics
Framing/electrical rough in Social Studies 3rd floor
Social studies, 3rdfloor air handler
Fin tube heaters laid out in the auditorium
Dressing room framing in the auditorium

Filed Under: Cyprus

Status of Projects November 2023 – Cyprus High School

November 2023

Updates:

Site Work:
● Asphalt paved on the North end of the site
● Asphalt prep for the Southwest parking lot
● Outbuildings concrete floors poured

Athletics:
● Basketball standards installed
● Tile in the PE locker rooms

Pool:
● Locker room framing and plumbing

CTE Buildings:
● Tilt panels stood into place  

Administration:
● Framing drywall throughout classroom spaces

Social Studies:
● Exterior glass installed
● Exterior framing

Cafeteria/Common Area:
● Level 3 concrete floor poured
● Exterior framing

Performing Arts:
● HVAC in corridors and Scenery/shop storage
● Glass installation in the Choral and Band room

Recent Photos:

Parking lot on the North end of the site
Concrete floors in the outbuildings
Parking lot prep Southeast parking lot
Basketball standards installed
Tile in the PE locker room
Framing in the Pool locker room
CTE Buildings tilted into place
Framing/Drywall in the Classroom spaces 
 Social studies glass installation 
Social studies exterior framing
Commons/Cafeteria Concrete floors level 3 
Commons/Cafeteria learning stairs
Scenery/Storage HVAC 
Band/Orchestra glass installation

Filed Under: Cyprus

Status of Projects November 2023 – Skyline High School

November 2023

Updates:

Site Work:

  • Underground utility work nearing completion in the central courtyard

Academics:

  • Cafeteria steel complete minus the activity stairs
  • Glass on main Academics Building 90 percent complete
  • Roof completed on the entire building
  • Final paint started in the Administration Suite
  • Athletics Vestibule life safety is complete, finishes (tile, paint, flooring) starting soon
  • Drywall ongoing on all floors, 90 percent complete on the second floor
  • In wall electrical, plumbing nearing completion on all floors 
  • Steel at the south stair tower nearing completion
Main Academics Building, as seen from the west parking lot
Stair tower steel progress where the Academics and the Performing Arts Buildings meet
Concrete paving in the Art Yard on the southwest side of the Academics Building
Accent walls and final paint in the Administration Suite
Classroom pod adjacent to the new cafeteria, level 2. Drywall nearing completion
Eagle’s Head that was salvaged from the old gymnasium, now installed in the new Athletics Vestibule
Athletics Vestibule, ready for wall finishes to start. Trophy Case framing on the left of the photo
Freezers/Coolers being set in the new Kitchen area.
Level 2 main corridor. Drywall nearing completion
Roof complete over the main cafeteria space
Main entrance to the building sheeted and ready for exterior finishes.

Filed Under: Skyline

Status of Projects November 2023 – West Lake STEM

November 2023

Updates:

  • Roofing is 90% complete.
  • Glass is being installed around the perimeter of the building.
  • Installation of interior finishes such as tile and paint continue.
  • Landscaping has begun in the area east of the school.
  • Rough grading of the athletic field has been completed and the running track is paved and striped.
  • Parking, bus, and fire lane paving is complete.
  • Millwork, overhead doors, and ceiling grids are being installed in the classrooms.
Commons Area
Track Paved and Striped
Millwork, overhead door, and ceiling grids.
Millwork in science lab rooms.

Filed Under: West Lake

Status of Projects October 2023 – West Lake STEM

October 2023

Updates:

  • Roofing is 75% complete.
  • Glass is being installed around the perimeter of the building.
  • Installation of interior finishes such as tile and paint continue.
  • Landscaping has begun in the area east of the school.
  • Rough grading of the athletic field and running track is progressing.
Exterior metal finish panel installation
Running track concrete placement complete
Large curtain wall window at commons area
Metal stud framing installed in kitchen area

Filed Under: West Lake

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Interim pages omitted …
  • Page 17
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...