Cyprus High School: Site Preparation
Site preparation is 100% complete.
Mass grading has been completed.
Kennecott site storm water drainage redirection project is completed.
![Cyprus Site Work](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-47.png)
![Cyprus Site Work](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-48.png)
Cyprus High School: Building Construction
Purchase order was issued to Westland Construction for construction of the new Cyprus High School.
Notice to proceed issued 09/13/2021.
Excavation of footings has begun.
![Cyprus Footings](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-50.png)
![Cyprus Footings](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2022/12/image-51.png)