Updates:
Site Work:
- West parking lot has been paved and striped
- Retaining walls are complete
Academics:
- Cafeteria and study hall steel is complete minus the main staircase
- Administration suite is nearing completion with drywall
- Roof is being completed above the cafeteria area
- Glass is going in on the remaining openings on the east side of the building
- Framing is nearing completion on all floors in the main building
- Rough in-wall electrical and plumbing has started on the second and third floors, and is almost complete on the second floor
- Canopies for the manufacturing yard and the art yard have been erected
- The athletics vestibule is starting drywall and will be weather tight by the end of this week
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-1.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-2.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-3.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-4.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-5.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-6.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-7.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-8.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-9.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-10.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-11.jpg)
![](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/10/Skyline-New-Entrance.jpg)