Updates:
Site Work:
- Ongoing site grading is in progress
- Football stadium storage tilt panels raised into position
- Light pole bases have been installed on the north side of the site
Athletics:
- Tile and waterproofing in the public restrooms and coaches’ office ongoing
- PE Locker rooms’ ceiling and paint have been completed
- Curtain walls for the vestibule and wrestling room installed
- Drywall installation is ongoing in the dance room
- Wrestling room benches have been completed
Pool:
- Seating structures have been formed, and cement pouring by sections
Academics:
- Stairs going from athletics to academics and 3rd to 4th floor
- Framing/HVAC on the fourth floor is ongoing
- Steel erection and metal decking are ongoing in the testing center
Performing Arts:
- Framing for the projector room is ongoing
- Scaffolding set in the auditorium for finishes to start
- Concrete poured on the third level of the upper lobby in the auditorium