Skyline High School
Athletics Complex
Softball batting cages installed.
Concessions and press box are painted with finishes being installed now.
Manufacturing lab and kitchen steel erection continues.
Academics tilt walls continue to be stood.
![Softball batting cages](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-38.png)
![Softball dugouts](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-39.png)
![Concessions interior finishes](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-40.png)
![Sidewalk prep around the pool connecting the softball complex to the athletics building](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-41.png)
![Shotcrete on existing exterior auditorium wall installed to provide structural resiliency and weather barrier](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-43.png)
![Steel for manufacturing lab / kitchen](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-42.png)
![Tilt walls in academics](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-44.png)
![Site overview](http://cdn-5b8b6132f911c804dc845e9d.closte.com/wp-content/uploads/2023/03/image-37.png)
Skyline High School
Athletics Complex
Softball batting cages installed.
Concessions and press box are painted with finishes being installed now.
Manufacturing lab and kitchen steel erection continues.
Academics tilt walls continue to be stood.