GSD Future

Long-Term Capital Outlook and Planning

  • Home
  • 2017 Bond Info
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Copyright 2023
Granite School District

Status of Projects August 2022 – West Lake

August, 2022 by Granite Schools

West Lake STEM Junior High School
Building Construction

Parking lot is being prepped to move cars off the street.
Perimeter footings are 95% complete and interior footings are 85% complete.
Approximately 26,000 sq ft of slab on grade has been placed.
Structural steel on south-west classroom wing being erected.

Footings
Footings
Floor slab for teacher’s common area
Floor slab for teacher’s common area
North parking lot curb & gutter
North parking lot curb & gutter
North parking lot curb & gutter
North parking lot curb & gutter
Structural steel framing being erected
Structural steel framing being erected
Structural steel framing being erected
Structural steel framing being erected