• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Status of Projects October 2023 – West Lake STEM

October 2023

Updates:

  • Roofing is 75% complete.
  • Glass is being installed around the perimeter of the building.
  • Installation of interior finishes such as tile and paint continue.
  • Landscaping has begun in the area east of the school.
  • Rough grading of the athletic field and running track is progressing.
Exterior metal finish panel installation
Running track concrete placement complete
Large curtain wall window at commons area
Metal stud framing installed in kitchen area

Filed Under: West Lake

Status of Projects October 2023 – Skyline High School

October 2023

Updates:

Site Work:

  • West parking lot has been paved and striped
  • Retaining walls are complete

Academics:

  • Cafeteria and study hall steel is complete minus the main staircase
  • Administration suite is nearing completion with drywall
  • Roof is being completed above the cafeteria area
  • Glass is going in on the remaining openings on the east side of the building
  • Framing is nearing completion on all floors in the main building
  • Rough in-wall electrical and plumbing has started on the second and third floors, and is almost complete on the second floor
  • Canopies for the manufacturing yard and the art yard have been erected
  • The athletics vestibule is starting drywall and will be weather tight by the end of this week
View of the entire project from the northwest. The central building in the photo is the Academics phase
View of the entire project from the southeast.
Completed west parking lot with striping
Canopy over the new manufacturing yard with some of the equipment set
Glass going into the large openings on the south-east side of the Academics Building
New air handlers on level 4 getting final duct connections
Concrete stem wall that goes below the grand staircase in the cafeteria
Concessions in the Athletics Lobby.
New slab and tilt panel where Academics transitions to the Performing Arts Building
Framing progress in the Ceramics Lab on Level 2
Typical drywall progress on levels 3 and 4 in the General Classrooms
Main Entrance and New Athletic Entrance

Filed Under: Skyline

Status of Projects October 2023 – Cyprus High School

October 2023

Updates:

Site Work:
● Curbing and asphalt prep at the North end of the site
● Football stadium footings have been poured
● Light poles have been installed throughout the North end of the site

Athletics:
● Tile and waterproofing on-going in the PE Locker rooms
● Glass installation in the vestibule
● Glass installation in the Weight room
● Paint in the Dance room

Pool:
● Gallery seating has been poured on the observation deck
● Concrete floors in the locker room area

Administration:
● Steel erection


Academics:
● Framing, electrical rough in throughout classroom spaces
● Cement floors on levels 2,3 and 4.
● Steel stud erection and metal decking

Performing Arts:
● Projector booth concrete has been poured
● Orchestra steps have been formed and poured

Recent Photos:

Site curbing, light posts and road base
Site curbing, light posts and road base
Football stadium footers
Waterproofing and tile in the PE locker rooms of athletics
Seating on the
observation deck of the pool
Concrete floor in the pool locker room
Steel stud erection in the administrative area
Framing and electrical rough in academics
Seats formed and poured on the observation deck of the pool
Steel stud erection and metal decking cafeteria/commons
Aerial photos of Cyprus High School
Aerial photos of Cyprus High School

Filed Under: Cyprus

Status of Projects September 2023 – Cyprus High School

September 2023

Updates:

Site Work:

  • Ongoing site grading is in progress
  • Football stadium storage tilt panels raised into position
  • Light pole bases have been installed on the north side of the site

Athletics:

  • Tile and waterproofing in the public restrooms and coaches’ office ongoing
  • PE Locker rooms’ ceiling and paint have been completed
  • Curtain walls for the vestibule and wrestling room installed
  • Drywall installation is ongoing in the dance room
  • Wrestling room benches have been completed

Pool:

  • Seating structures have been formed, and cement pouring by sections

Academics:

  • Stairs going from athletics to academics and 3rd to 4th floor
  • Framing/HVAC on the fourth floor is ongoing
  • Steel erection and metal decking are ongoing in the testing center

Performing Arts:

  • Framing for the projector room is ongoing
  • Scaffolding set in the auditorium for finishes to start
  • Concrete poured on the third level of the upper lobby in the auditorium

Recent Photos:

Site work ongoing
Football stadium storage raised into position
Light pole bases on site
Waterproofing and tile in public restroom in athletics 
Ceiling and paint in the PE locker rooms
Patch and paint throughout athletics
Glass frames for the vestibule and weight room
Glass frames for the vestibule and weight room
Stairs from athletics to academics
Gallery seating formed and being poured in sections
Wrestling room benches
Drywall in the dance room

Filed Under: Cyprus

Status of Projects September 2023 – Skyline High School

September 2023

Academics Phase Updates:​

  • Preparation for asphalt paving in the west lot the first week of September. ​
  • Retaining walls are nearly complete and curb and gutter is being poured. ​
  • The Cafeteria and Study Hall steel is nearing completion. ​
  • Framing is nearly complete in the main Academics building and drywall has started.​
  • In the north administration suite, they have started taping and finishing the drywall.​
  • Window frames have gone into most of the small openings. The larger openings started getting frames this week. ​
  • Overhead duct work, plumbing and electrical is almost complete in the Academics building and in wall rough in has started in most areas where framing is done. ​
  • The Manufacturing Lab block walls are installed and finishes will start in that area. The larger equipment has been loaded into the area and steel has started on the yard portion.​

Recent Photos:

View of the entire project from the west, the central building in the photo is the Academics phase
View of the entire project from the southeast, the large metal roof is the cafeteria (level 2) and the Study Hall (level 3)​
Manufacturing lab block is complete on level 1​
Manufacturing lab yard slab being placed and finished with prep started for steel erection​
View of the Athletics building lobby, metal panels and window frame install is almost complete​
Typical progress of an office in the Administration Suite
Overhead duct work and plumbing almost complete on level 2 Special Education and art classrooms
View into the cafeteria area from the study hall
Biology and physics classrooms showing typical framing progress on all 3 floors in the academics building
Athletics building lobby window frames will install in the next few weeks
Tilt panels are up on the transition area between academics and performing arts with the slab placed to allow steel erection to begin
Framing and duct progress on the general classrooms just north of the cafeteria above the administration suite

​

Filed Under: Skyline

Taylorsville Network Projects Completed Since 2017

July 2023

Arcadia Elementary:

A freezer/cooler was added. The front office security project was completed. Carbon monoxide detectors were installed. The domestic water pipping was replaced. A partial re-roof project occurred. A special education relocation project was completed.

Bennion Elementary:

The fire alarm system was upgraded. The front office security remodel was completed. The HAVC air flow was upgraded. Some student drop-off modifications were completed.

Calvin Smith Elementary:

The front office security remodel was completed. The fire alarm was upgraded. The irrigation for the play fields was automated. An interior facelift happened. The HVAC controls were upgraded.

Fox Hills Elementary:

An interior facelift occurred. The front office security was completed. Carbon Monoxide detectors were installed. Playground turf was installed under the play structures. The air conditioning system was upgraded. A pedestrian bridge was added with associated site improvements. The HVAC controls were upgraded.

Fremont Elementary:

The front office security project was completed with an addition. Carbon Monoxide detectors were installed. The concrete columns under the school were shored up.

Taylorsville Elementary:

Kitchen and associated cooler box addition was completed. New in-wall cafeteria tables were added. Computer room change occurred.

Truman Elementary:

The front office security project was completed. The furnace and condenser were replaced. The HVAC system was upgraded.

Vista Elementary:

New in-wall cafeteria tables were added. The front office security project was completed with an addition. Carbon Monoxide detectors were installed. The irrigation for the play fields was automated.

Eisenhower Jr.:

The domestic water piping was redone. The auditorium audio system needed to be upgraded with a new system. New single-occupancy changing rooms were added. The south exterior wall was cleaned up so waterproofing could be applied the concrete wall. 

Bennion Jr.: 

The auditorium audio system was upgraded. The boiler was replaced. Significant earthquake repairs were performed. The fire panel was replaced for the fire alarm system and the HVAC controls were to be upgraded.

Taylorsville High:

The tennis courts were resurfaced and are being worked on again summer 2023. An auto shop lift was installed. Gymnasium bleachers were replaced. The softball home run fence was installed. The EPIC audio enhancement was installed. A main office remodel occurred. A new 16 room portable classroom unit was purchased and had all the necessary power, security, fire alarm and water/sewer connections. The baseball and softball dugouts were redone. A new chiller was purchased and installed. A new artificial turf replaced the old one. Four new relocatable classrooms have been installed. HVAC controls are being upgraded. Air conditioning addition to the main and auxiliary gymnasiums is underway.

Filed Under: Feature, Uncategorized

Status of Projects May 2023 – Cyprus High School

May 2023

Panels leading to the auditorium continue to be tilted into place.

Trusses have been set in place above the drama studio/black box theater.

Mezzanine on the third floor has been placed, additional cat walks and storage areas have been fabricated. Stairs have been fabricated between the third and fourth floor mezzanine.

Air handlers have also been placed on the third floor. Underground utilities have been laid out to be buried and have utilities run through them. Cast in place concrete walls are being formed.

Panels and steel decking for the academics area is being tilted and secured in place. Decking has been completed on the second and third floor. Fabricators are working on the roof of the academics building.

Framing for ceiling hard lid has been fabricated in the basement of the gymnasium. Insulation is currently being installed in the basement and second level of the track and gymnasium area. Exhaust fan plumbing has been installed in the team rooms and bathrooms. Air exchanger has been installed and HVAC continues to be installed in the basement. Roof drains have been installed in the gymnasium and in the pool area.

Cyprus C has been formed and is curing.




Panels being placed leading up to the auditorium and the trusses being placed over the drama theater.



Panels being placed leading up to the auditorium and the trusses being placed over the drama theater.



Concrete on the third-floor mezzanine and stairs leading from the third to fourth floor mezzanine.



Concrete on the third-floor mezzanine and stairs leading from the third to fourth floor mezzanine.
Air handlers being placed on the third floor of the auditorium.
Air handlers being placed on the third floor of the auditorium.
Catwalks in the auditorium and underground utilities being placed. 
Catwalk in the corridor of the auditorium. Cast in place concrete walls in the auditorium .
Catwalk in the corridor of the auditorium. Cast in place concrete walls in the auditorium .
Steel decking in the academic’s area. Roof of academics building being installed. 
Steel decking in the academic’s area. Roof of academics building being installed. 
Insulation and hard lid ceiling being installed in the basement of the gymnasium.
Insulation and hard lid ceiling being installed in the basement of the gymnasium.
Exhaust fans in the restrooms and team rooms. Industrial air exchanger in the basement of the gymnasium.  
Exhaust fans in the restrooms and team rooms. Industrial air exchanger in the basement of the gymnasium.  
Roof drains in the gymnasium and pool area.
The Cyprus “C”that is going on the outside of the drama studio.

Filed Under: Cyprus

Status of Projects May 2023 – Skyline High School

May 2023

Significant progress has been made on the structure of the project now that the weather has been improving. The majority of levels 1-4 have had the structural steel completed and they have started installing the decking throughout to prepare for several pours on May 2nd, 3rd and 4th.

The framer has almost finished the north half of the administrative suite and the in wall electrical and plumbing has started. The roof was also completed in this area.

The south half of the administration area slab was poured and the tilt panels that go along the west end of this area have been formed and prepped to be placed next week.

The kitchen area is almost completed with framing and in wall electrical and plumbing. The mechanical duct work is also near completion.

With the nicer weather, the sports fields have almost dried out and are getting close to being available for use. The north pathway on the property should also be open to the public in the next week.




View of the main academics building looking from the west side of the property
4/3/23.



Same view of the building but with significant progress to the structural framing
4/20/23.



Administration area with the framing starting. 



Administration area north half. Framing is almost complete, and the duct work is installed. In wall plumbing and electrical has started as well.



Administration offices south slab being prepared for pouring.



Administration offices slab poured. North walls being formed, and rebar installed for a pour next week. These will go along the east wall.



New cafeteria slab being prepared for pouring. This will also be used to pour tilt panels.



New cafeteria slab being poured and finished.



Level 3 looking into the new classrooms and student collaboration areas. Decking almost complete.



Level 4 of the academics building looking into the new chemistry lab and student collaboration areas. Decking almost complete.



Looking west at the new academics building. This is looking into special education (ground level), general classrooms (floor 2) and STEM labs and classrooms (floor 3).



Looking north down the main academics building hallway.

Filed Under: Skyline

Status of Projects May 2023 – West Lake STEM

May 2023

Rough-ins in three of the academic wings are nearly complete, roofing has begun, and drywall will begin soon.

Decking for running track in gymnasium is being installed.

Interior masonry walls in auditorium are in progress.

Structural masonry is mostly complete and veneer facing is in progress.




Brick veneer facing on gymnasium.



Masonry walls for service courtyard.



Interior metal stud framing in academics.



Running track in gymnasium.



Acoustic roof decking over commons corridor.



Roofing trusses over choral room.



Interior masonry walls in auditorium.



Brick veneer facing on gymnasium.

Filed Under: West Lake

Status of Projects April 2023 – Cyprus High School

April 2023

Cyprus High School
Building Construction

Kitchen panels have been erected creating a corridor between athletics and academics. A lecture hall and mechanical room will come off either side of the corridor and the lecture hall will be the next panel erected.

Auditorium – three of the walls have been raised and braced so that heavy equipment can come and go from the area. Steel decking has been installed on the upper levels creating walkable areas.Concrete has been placed on the stage and the landing leading up to the stage. Concrete is currently curing and is covered by tarps.Dressing area/storage has been raised and braced. This area will serve as storage of the performing arts.

Academics structure has been installed and two tilt panels have been raised around the structure. A double decker air handler system will be installed to service the area. Remaining tilt panels are curing, these will be installed on the north side of the structure. Elevator shaft has been erected and braced. This is the only elevator shaft that is tilt up on three sides in the building. This will service all three floors for academics.

Drywall in the basement of gymnasium has progressed to 90%. Masonry work has been completed in the basement of athletics. Copper and steel weld piping have been placed and have passed inspections. Window frames have been installed in athletics. Glass has been ordered and will be installed in the next couple of weeks.




Panels in academics and the elevator shaft.



Auditorium walls and concrete placed on the stage.



Auditorium walls and concrete placed on the stage.



Steel decking and raised walls for dressing area.



Steel decking and raised walls for dressing area.



Structure for academics and remaining tilt panels.



Structure for academics and remaining tilt panels.



Drywall in the team rooms and window frames in athletics.



Drywall in the team rooms and window frames in athletics.



Masonry walls and the copper piping.



Masonry walls and the copper piping.



Panels in academics and the elevator shaft.

Filed Under: Cyprus, Project Updates

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Interim pages omitted …
  • Page 18
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...