• Skip to primary navigation
  • Skip to secondary navigation
  • Skip to main content
  • Skip to primary sidebar

Granite School DistrictGranite School District logo

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact
  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Skyline Construction Update Video – March 2024

March 2024

Filed Under: Project Updates, Skyline

Status of Projects March 2024 – Skyline High School

March 2024

Updates:

Academics

●High ceiling in Cafeteria painted
●Exterior glass complete at Main Entrance
●Metal wood look soffits near completion in Cafeteria
●Storefront glass frames installed at Media Center
●Interior glass in classroom groups started
●Carpet and electrical trim started in Level 2 general classrooms
●Cabinet installation ongoing in Level 3 Science classrooms
●Painting on Level 2 near completion
●Main Corridor tile complete on Levels 2 and 3
●Tile at the Smoothie Bar complete
●Plumbing fixtures set in Administration Suite bathrooms

Recent Pictures:

Level 3 general classrooms with finishes being installed
Level 3 general classrooms with finishes being installed
Soffit in the Eagle’s Nest
Soffit in the Eagle’s Nest
Rolling shelves in the Administration file room
Rolling shelves in the Administration file room
Plumbing fixtures in Administration bathrooms
Plumbing fixtures in Administration bathrooms
Exterior glass and painted ceiling in
Cafeteria/Commons
Exterior glass and painted ceiling in
Cafeteria/Commons
Administration Suite entrance
Administration Suite entrance
Cabinets installed in Level 3 Science classrooms
Cabinets installed in Level 3 Science classrooms
Storefront window frames at the Media Center
Storefront window frames at the Media Center
Stone cladding at the Pool/Athletics entrance
Stone cladding at the Pool/Athletics entrance
Ceiling grid in the Testing Center
Ceiling grid in the Testing Center
Smoothie Bar tile
Smoothie Bar tile

Filed Under: Skyline

Status of Projects March 2024 – West Lake STEM

March 2024

Updates:

  • The three Academic wings are having countertops installed on cabinets, sinks installed in the restrooms, and wiring and sensors placed in the ceilings.
  • The Administration wing has cabinets ready to be installed.
  • The Serving area has decorative wall tile being installed.
  • HVAC ducts are 90% complete.
South view of project site
South view of project site
Glazing at North Entry
Glazing at North Entry
Preparation for floor tile in Kitchen
Preparation for floor tile in Kitchen
Large sink in restroom group
Large sink in restroom group
Railings in the Commons Area
Railings in the Commons Area
Sound panels in Auditorium
Sound panels in Auditorium
Acoustical treatment in Gymnasium
Acoustical treatment in Gymnasium
Communication wiring in classrooms
Communication wiring in classrooms
South elevator installation in progress
South elevator installation in progress

Filed Under: West Lake

Status of Projects March 2024 – Cyprus High School

March 2024

Updates:

Site Work/Mechanical Yard:
●Footings/foundation at the Softball, Baseball Field
●Setting the generators into place

Athletics/Pool:
●Track Handrail Shoe
●Locker being placed in the PE Locker Rooms
●Pool painting
●Window caulking

Administration/Commons:
●Level 3 framing
●Level 1 slab on grade pour
●Prepping slab on grade in the Public Square/Dining

Academics/Social Studies:
●Framing of classrooms and display cases
●Drywall around the skylights
●Frames and glazing on the stair tower
●Finish paint on Levels 2 and 3

Performing Arts:
●Curtain wall and glazing around the Lobby

Recent Photos:

Softball Field footings/foundation
Softball Field footings/foundation
Setting the generators into place
Setting the generators into place
Track handrail shoe
Track handrail shoe
Lockers being placed in the PE Locker Room
Lockers being placed in the PE Locker Room
Pool painting and window caulking
Pool painting and window caulking
Framing on Level 3 of the Administration Building
Framing on Level 3 of the Administration Building
Framing of classrooms and display cases in the
Academics Building
Framing of classrooms and display cases in the
Academics Building
Drywall around the skylights in
the Academics Building
Drywall around the skylights in
the Academics Building
Frames and glazing, Social Studies
Frames and glazing, Social Studies
Paint on Level 2 of the Social Studies wing
Paint on Level 2 of the Social Studies wing
Curtain wall and glazing around the Auditorium Lobby
Curtain wall and glazing around the Auditorium Lobby

Filed Under: Cyprus

Status of Projects February 2024 – West Lake STEM

February 2024

Updates:

  • The three Academic wings have cabinetry, ceiling grid, electrical, and mechanical systems in place
  • The Administration wing has been painted and ceiling grid installation is in progress.
  • The CTE wing has interior windows installed and ceiling grid installation is in progress.
  • Wall tile in corridors and restrooms is 85% complete.
Decorative metal panels at main entry
Decorative metal panels at main entry
Store front system in Administration corridor
Store front system in Administration corridor
Wall tile work in CTE wing
Wall tile work in CTE wing
Framing for acoustic sound panels in
Auditorium ceiling
Framing for acoustic sound panels in
Auditorium ceiling
Main entry to Auditorium
Main entry to Auditorium
Tech Lab interior
Tech Lab interior
Decorative color tile in restrooms
Decorative color tile in restrooms

Filed Under: West Lake

Status of Projects February 2024 – Skyline High School

February 2024

Updates:

Academics

●Activity Stairs in the cafeteria are fully erected.
●Drywall and framing are nearing completion in the cafeteria area.
●All in-wall utilities are near completion throughout the entire building.
●Ceiling grid is being worked on in all general classrooms and is complete in the Administration Suite. ●Casework/cabinets are being installed in the lab classrooms on level 4.
●Fixed glass walls have started in the general classroom groups on level 3.
●Curtain wall glass is nearing completion on the Cafeteria.
●Testing Center is now drywalled and taped.
●Trophy shelving is being installed in the new Athletics Vestibule.
●Tile is nearing completion in the Administration bathrooms.
●Fire sprinkler systems are nearing completion on 3 floors.
●Framing in the south stair tower has started.

Recent Pictures:

Main academics building and Cafeteria as viewed from the Courtyard
Main academics building and Cafeteria as viewed from the Courtyard
Main academics building and Cafeteria as viewed from the Courtyard
Main academics building and Cafeteria as viewed from the Courtyard
Main Activity staircase and Cafeteria progress
Main Activity staircase and Cafeteria progress
Trophy case glass being installed in Athletics Vestibule
Trophy case glass being installed in Athletics Vestibule
Millwork being installed in the Chemistry Labs on level 3
Millwork being installed in the Chemistry Labs on level 3
Millwork being installed in the Chemistry Labs on level 3
Millwork being installed in the Chemistry Labs on level 3
Grid installed and fixed glass walls in progress in Level 3 classroom group
Grid installed and fixed glass walls in progress in Level 3 classroom group
Testing Center with drywall
Testing Center with drywall
Main Entrance Vestibule being framed in
Main Entrance Vestibule being framed in
Tile installed in the Administration Suite bathrooms
Tile installed in the Administration Suite bathrooms
Wall tile in Main Corridor on Level 2
Wall tile in Main Corridor on Level 2
Large soffits outside of classroom groups
framed and drywalled
Large soffits outside of classroom groups
framed and drywalled

Filed Under: Skyline

Status of Projects February 2024 – Cyprus High School

February 2024

Updates:

Site Work:
●Planter boxes behind the home side bleachers and between   Athletics and Administrative Suite
●Fencing fabric stretched between posts
●Visitor side bleachers under construction

Athletics:
● Tile in the restrooms

Pool:
●Painting

Mechanical Yard:
● Slab on grade
● Set steel

Administration:
● Slab under electric

Academics:
● Paint on 2nd and 3rd levels
● Skylights in corridor

Social Studies:
● Rough Plumbing on levels 2 and 3
● Painting accent walls and classrooms

Performing Arts:
● Painting on the stage and scenery storage
● Ceiling grid in the Band room

Recent Photos:

Planter boxes behind the home side bleachers
Planter boxes behind the home side bleachers
Planter boxes between Athletics and
Administrative Suite
Planter boxes between Athletics and
Administrative Suite
Site fencing
Site fencing
Visitor side bleachers in stadium
Visitor side bleachers in stadium
Restroom tile, Athletic building level 1
Restroom tile, Athletic building level 1
Painting in the Pool
Painting in the Pool
Slab on grade and steel setting Mechanical yard
Slab on grade and steel setting Mechanical yard
Under slab electrical in the Administrative suite
Under slab electrical in the Administrative suite
Painting in a Science classroom
Painting in a Science classroom
Skylights installed in the Academic building
Skylights installed in the Academic building
Rough plumbing level 2
Rough plumbing level 2
Painting and accents level 2
Painting and accents level 2
Painting in the scenery room of the Auditorium
Painting in the scenery room of the Auditorium
Band Room ceiling grid, Performing Arts building
Band Room ceiling grid, Performing Arts building

Filed Under: Cyprus

Status of Projects Update: February 2024

February 2024

Watch the presentation in the video below for updates about Granite School District construction projects (0:00 – 20:37). This presentation was given in the February 2024 Board of Education Administrative Session. Click here for a copy of the slides.

Filed Under: Project Updates

Status of Projects Update: January 2024

January 2024

Watch the presentation in the video below for updates about Granite School District construction projects (0:00 – 23:15). This presentation was given in the January 2024 Board of Education Administrative Session. Click here for a copy of the slides.

Filed Under: Project Updates

West Lake STEM Jr. High Construction Tour

January 2024

Filed Under: Project Updates, West Lake

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Interim pages omitted …
  • Page 18
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...