  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates

Cyprus High Construction Tour – April 2024

April 2024

Filed Under: Cyprus, Project Updates

West Lake STEM Jr. High Construction Tour – April 2024

April 2024

Filed Under: Project Updates, West Lake

Status of Projects April 2024 – West Lake STEM

April 2024

Updates:

  • Permanent power to the site is connected. Exterior glazing is 95% complete. The two rooftop air handling units serving the Gymnasium have arrived
  • In the Athletic Wing and the Kitchen, the electrical rough-in is 75% complete. The floor and wall tile are also 75% complete.
  • The stage rigging in Performing Arts is being installed.
  • In the CTE Wing, the mechanical, electrical, plumbing installation and the interior paint work is moving forward.
  • The Academic and Administration Wings are progressing with cabinetry installation. The diffusers and grills are 85% complete.
Indoor running track railing installation
Indoor running track railing installation
Ceiling paint in Gymnasium
Ceiling paint in Gymnasium
Tile work in Kitchen and Serving Areas
Tile work in Kitchen and Serving Areas
Delivery of air handling units
Delivery of air handling units
Cabinetry and countertops in science classrooms
Cabinetry and countertops in science classrooms
Sewing machine cabinets delivered to CTE Wing
Sewing machine cabinets delivered to CTE Wing
Elevator installation in progress
Elevator installation in progress
Elevator installation in progress
Elevator installation in progress

Filed Under: West Lake

Status of Projects April 2024 – Skyline High School

April 2024

Updates:

Academics

● Ceiling cloud being installed in Cafeteria Area
● Stone cladding complete at Main Entrance
● Lighting installed in Cafeteria
● Glass installed in majority of classroom groups
● Carpet complete on Level 2
● LVT starting in corridors
● Tile started in group restrooms on north end of building   on all floors
● Ceiling grid started on all floors
● Cabinetry started on Level 1
● Doors being installed throughout entire building
● Countertops installed in science labs on Level 3
● Restroom accessories being installed

Recent Pictures:

Cabinets in Special Education Classroom
Cabinets in Special Education Classroom
Cabinets installed in the Administration Suite Workroom
Cabinets installed in the Administration Suite Workroom
Tile and storefront being installed in
Level 1 restroom
Tile and storefront being installed in
Level 1 restroom
LVT flooring and glass installed in Fix-It Room by the Media Center on Level 2
LVT flooring and glass installed in Fix-It Room by the Media Center on Level 2
Stone cladding at the Main Entrance
Stone cladding at the Main Entrance
Stair tower connecting Academics to
Performing Arts
Stair tower connecting Academics to
Performing Arts
Teacher’s Lounge cabinets and accent paint
Teacher’s Lounge cabinets and accent paint
Countertops installed in Level 3 science labs
Countertops installed in Level 3 science labs
Plumbing fixtures and accessories installed in Administration Suite restroom
Plumbing fixtures and accessories installed in Administration Suite restroom
High ceiling clouds being installed in
the Cafeteria
High ceiling clouds being installed in
the Cafeteria
Glass installed at the Level 2 classrooms
Glass installed at the Level 2 classrooms
Wood-look acoustical ceiling grid outside of Level 2 Media Center
Wood-look acoustical ceiling grid outside of Level 2 Media Center
Northwest property line by Softball Fields
Northwest property line by Softball Fields
Stairway into the gully
Stairway into the gully
Gully
Gully

Filed Under: Skyline

Status of Projects April 2024 – Cyprus High School

April 2024

Updates:

Building Exterior:
● Glass installation at the Auditorium
● Glass installation at Academics

Athletics/Pool:
● Pool excavation/footings
● Tile in Pool locker rooms
● Ceiling tile in Athletics Vestibule
● Tectum panels in Weight Room

Administration/Commons:
● Slab on grade in Cafeteria Area of Commons
● Level 1 framing and HVAC in Administration
● Level 2 and 3 framing

Academics/Social Studies:
● Framing Level 2
● Framing and electrical Level 3

Performing Arts:
● Drywall on the Proscenium
● Paint and framing in Scenery Shop

Recent Photos:

Curtain wall and glass installation on the exterior of the Auditorium
Curtain wall and glass installation on the exterior of the Auditorium
Curtain wall and glass installation on the exterior of Academics
Curtain wall and glass installation on the exterior of Academics
Pool excavated and footings poured
Pool excavated and footings poured
Tile in Pool Locker Room
Tile in Pool Locker Room
Ceiling tile in the Athletics Vestibule
Ceiling tile in the Athletics Vestibule
Tectum panels in the Weight Room
Tectum panels in the Weight Room
Slab on grade in Student Commons
Slab on grade in Student Commons
Framing and HVAC in Administration Level 1
Framing and HVAC in Administration Level 1
Framing in Administration Level 2
Framing in Administration Level 2
Framing and electrical in Administration Level 3
Framing and electrical in Administration Level 3
Framing on Level 1 of classrooms in Academics
Framing on Level 1 of classrooms in Academics
Drywall on Level 3 of classrooms in Academics
Drywall on Level 3 of classrooms in Academics
Drywall over the Proscenium
Drywall over the Proscenium
Paint and framing in the Scenery Shop
Paint and framing in the Scenery Shop

Filed Under: Cyprus

Status of Projects Update: April 2024

April 2024

Watch the presentation in the video below for updates about Granite School District construction projects (1:05:50 – 1:19:21). This presentation was given in the April 2024 Board of Education Meeting. Click here for a copy of the slides.

Filed Under: Project Updates

Skyline Construction Update Video – March 2024

March 2024

Filed Under: Project Updates, Skyline

Status of Projects March 2024 – Skyline High School

March 2024

Updates:

Academics

●High ceiling in Cafeteria painted
●Exterior glass complete at Main Entrance
●Metal wood look soffits near completion in Cafeteria
●Storefront glass frames installed at Media Center
●Interior glass in classroom groups started
●Carpet and electrical trim started in Level 2 general classrooms
●Cabinet installation ongoing in Level 3 Science classrooms
●Painting on Level 2 near completion
●Main Corridor tile complete on Levels 2 and 3
●Tile at the Smoothie Bar complete
●Plumbing fixtures set in Administration Suite bathrooms

Recent Pictures:

Level 3 general classrooms with finishes being installed
Level 3 general classrooms with finishes being installed
Soffit in the Eagle’s Nest
Soffit in the Eagle’s Nest
Rolling shelves in the Administration file room
Rolling shelves in the Administration file room
Plumbing fixtures in Administration bathrooms
Plumbing fixtures in Administration bathrooms
Exterior glass and painted ceiling in
Cafeteria/Commons
Exterior glass and painted ceiling in
Cafeteria/Commons
Administration Suite entrance
Administration Suite entrance
Cabinets installed in Level 3 Science classrooms
Cabinets installed in Level 3 Science classrooms
Storefront window frames at the Media Center
Storefront window frames at the Media Center
Stone cladding at the Pool/Athletics entrance
Stone cladding at the Pool/Athletics entrance
Ceiling grid in the Testing Center
Ceiling grid in the Testing Center
Smoothie Bar tile
Smoothie Bar tile

Filed Under: Skyline

Status of Projects March 2024 – West Lake STEM

March 2024

Updates:

  • The three Academic wings are having countertops installed on cabinets, sinks installed in the restrooms, and wiring and sensors placed in the ceilings.
  • The Administration wing has cabinets ready to be installed.
  • The Serving area has decorative wall tile being installed.
  • HVAC ducts are 90% complete.
South view of project site
South view of project site
Glazing at North Entry
Glazing at North Entry
Preparation for floor tile in Kitchen
Preparation for floor tile in Kitchen
Large sink in restroom group
Large sink in restroom group
Railings in the Commons Area
Railings in the Commons Area
Sound panels in Auditorium
Sound panels in Auditorium
Acoustical treatment in Gymnasium
Acoustical treatment in Gymnasium
Communication wiring in classrooms
Communication wiring in classrooms
South elevator installation in progress
South elevator installation in progress

Filed Under: West Lake

Status of Projects March 2024 – Cyprus High School

March 2024

Updates:

Site Work/Mechanical Yard:
●Footings/foundation at the Softball, Baseball Field
●Setting the generators into place

Athletics/Pool:
●Track Handrail Shoe
●Locker being placed in the PE Locker Rooms
●Pool painting
●Window caulking

Administration/Commons:
●Level 3 framing
●Level 1 slab on grade pour
●Prepping slab on grade in the Public Square/Dining

Academics/Social Studies:
●Framing of classrooms and display cases
●Drywall around the skylights
●Frames and glazing on the stair tower
●Finish paint on Levels 2 and 3

Performing Arts:
●Curtain wall and glazing around the Lobby

Recent Photos:

Softball Field footings/foundation
Softball Field footings/foundation
Setting the generators into place
Setting the generators into place
Track handrail shoe
Track handrail shoe
Lockers being placed in the PE Locker Room
Lockers being placed in the PE Locker Room
Pool painting and window caulking
Pool painting and window caulking
Framing on Level 3 of the Administration Building
Framing on Level 3 of the Administration Building
Framing of classrooms and display cases in the
Academics Building
Framing of classrooms and display cases in the
Academics Building
Drywall around the skylights in
the Academics Building
Drywall around the skylights in
the Academics Building
Frames and glazing, Social Studies
Frames and glazing, Social Studies
Paint on Level 2 of the Social Studies wing
Paint on Level 2 of the Social Studies wing
Curtain wall and glazing around the Auditorium Lobby
Curtain wall and glazing around the Auditorium Lobby

Filed Under: Cyprus

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Interim pages omitted …
  • Page 18
  • Go to Next Page »

Primary Sidebar

Website Search

  • Home
  • 2017 Bond Info
    • Plan of Finance and Progress Report
    • Phase One Update
    • Why Rebuild?
      • Facility Conditions
      • 21st Century Learning
      • Safety & Security
    • Research & Design
      • Design FAQ
      • Examples
      • Imperatives
  • Contact

Current Projects

  • Cyprus High School
    • Project Updates
    • Layout
  • Skyline High School
    • Project Updates
    • Layout
    • Timeline
  • West Lake Jr. High
    • Project Updates
    • Layout & Timeline
  • All Updates


Non-Discrimination Statement

Granite School District prohibits discrimination, harassment (including sexual harassment), or retaliation on the basis of race, color, sex, pregnancy, religion, national origin, marital status, disability, sexual orientation, gender identity or any other legally protected classification in all educational programs, activities, admissions, access, treatment, or employment practices and provides equal access to scouting groups and other designated youth groups. Related inquiries and complaints may be directed to a school administrator or to David Gomez, Title IX Coordinator, 504 Coordinator, and Director of Educational Equity, (385) 646-5000. You may also contact the Office for Civil Rights, Denver, CO, (303) 844-5695. Read Policy V.C.1.

Commitment to Accessibility

The Granite School District is committed to making our content accessible to all members of the public and district, including those with disabilities. If this applies to you, and you would like to provide feedback or report a concern, please contact our Communications Office.

Content Disclaimer

The Granite School District is not responsible for the text and content of websites not owned and operated by the Granite School District.

© 2025 Granite School District

 

Loading Comments...