<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>GSD Future</title>
	<atom:link href="https://gsdfuture.org/feed/" rel="self" type="application/rss+xml" />
	<link>https://gsdfuture.org</link>
	<description>Long-Term Capital Outlook and Planning</description>
	<lastBuildDate>Mon, 19 Oct 2026 15:24:09 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>
<site xmlns="com-wordpress:feed-additions:1">135514665</site>	<item>
		<title>Capital Construction Budget/Tax Snapshot &#8211; October 2026</title>
		<link>https://gsdfuture.org/2026/10/23/capital-construction-budget-tax-snapshot-october-2026/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Fri, 23 Oct 2026 15:23:03 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2991</guid>

					<description><![CDATA[Facility Maintenance Fund In fiscal year 2027, approximately $23.0 million in districtwide general maintenance and operations expenditures will be funded through the restricted Capital Fund, which includes nearly $1.0 million in additional capital tax levy revenue specifically earmarked to address deferred maintenance needs throughout the district. This was all made possible by the tax increase [&#8230;]]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><em>Facility Maintenance Fund</em></p>



<p class="wp-block-paragraph">In fiscal year 2027, approximately $23.0 million in districtwide general maintenance and operations expenditures will be funded through the restricted Capital Fund, which includes nearly $1.0 million in additional capital tax levy revenue specifically earmarked to address deferred maintenance needs throughout the district. This was all made possible by the tax increase that was approved by the board in August 2026. This maintenance fund has not increased in over 30 years despite ongoing challenges with escalating costs to maintain the oldest school buildings (on average) in the State of Utah. We continue to use our pay-as-you-go model to rebuild and remodel our facilities. This facility maintenance helps offset much needed updates such as playground equipment, carpet, and HVAC systems in our buildings that are not slated for rebuild.&nbsp;</p>



<p class="wp-block-paragraph"><em>Pay-as-you-Go Rebuild/Remodel</em></p>



<p class="wp-block-paragraph">As a reminder for District patrons, Granite School District’s pay-as-you-go model is a long-term strategy for funding school facility improvements while reducing the need for future voter-approved bonds. Adopted as part of the district’s 2017 capital/construction strategy, the approach was designed to address a significant backlog of aging school buildings. The plan combined an initial bond to fund major construction projects with a commitment to save for additional projects using property tax revenue. Rather than reducing the capital tax levy as bond payments are paid off, the district retains that revenue and redirects it toward its capital fund.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="1024" height="726" data-attachment-id="2992" data-permalink="https://gsdfuture.org/2026/10/23/capital-construction-budget-tax-snapshot-october-2026/image-252/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?fit=1418%2C1006&amp;ssl=1" data-orig-size="1418,1006" data-comments-opened="0" data-image-title="image" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?fit=1024%2C726&amp;ssl=1" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?resize=1024%2C726&#038;ssl=1" alt="Financial Model showing pay as you go (png)" class="wp-image-2992" style="aspect-ratio:1.408450704225352;width:601px;height:auto" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?resize=1024%2C726&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?resize=767%2C544&amp;ssl=1 767w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?resize=300%2C213&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.png?w=1418&amp;ssl=1 1418w" sizes="(max-width: 1000px) 100vw, 1000px" /></figure>



<p class="wp-block-paragraph">As existing bonds are paid off, the revenue previously used for debt service is transferred to the capital/construction levy, allowing the district to save up funds to pay for future construction and renovations without incurring new debt. Under this model, the district must have the money available before beginning projects funded through pay-as-you-go. Those funds are intended to support a 40-year list of facility improvements, including school rebuilds and remodels. The long-term goal is to create a sustainable funding source for capital/construction needs that could eliminate the need for significant tax increases in the future, while maintaining the district’s commitment to address aging facilities.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2991</post-id>	</item>
		<item>
		<title>GTI Remodel</title>
		<link>https://gsdfuture.org/2026/10/21/gti-remodel/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Wed, 21 Oct 2026 15:21:00 +0000</pubDate>
				<category><![CDATA[GTI]]></category>
		<category><![CDATA[Project Updates]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2988</guid>

					<description><![CDATA[Granite Technical Institute (GTI) received a $5 million APEX grant from the State of Utah to develop a new hospitality and tourism center, featuring what is planned to be Utah’s first student-led restaurant and event center of its kind. The project will provide students with hands-on, real-world experience in a professional setting, bringing together multiple [&#8230;]]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Granite Technical Institute (GTI) received a $5 million APEX grant from the State of Utah to develop a new hospitality and tourism center, featuring what is planned to be Utah’s first student-led restaurant and event center of its kind. The project will provide students with hands-on, real-world experience in a professional setting, bringing together multiple programs, including culinary arts, finance, and graphic design. Students will help operate both the restaurant and event center, with an adult event manager providing oversight.</p>



<p class="wp-block-paragraph">The goal is to create a proficiency-based, career-focused learning environment where students gain practical experience managing the operations of a hospitality business, from food preparation and service to event management and financial operations. The center is intended to become self-sustaining, and construction was anticipated to support an opening in fall 2027.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" decoding="async" width="1024" height="542" data-attachment-id="2989" data-permalink="https://gsdfuture.org/2026/10/21/gti-remodel/image-251/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?fit=1690%2C894&amp;ssl=1" data-orig-size="1690,894" data-comments-opened="0" data-image-title="image" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?fit=1024%2C542&amp;ssl=1" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?resize=1024%2C542&#038;ssl=1" alt="GTI infographic (png)" class="wp-image-2989" style="aspect-ratio:1.8846153846153846;width:739px;height:auto" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?resize=1024%2C542&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?resize=300%2C159&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?resize=767%2C406&amp;ssl=1 767w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?resize=1536%2C813&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.png?w=1690&amp;ssl=1 1690w" sizes="(max-width: 1000px) 100vw, 1000px" /></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2988</post-id>	</item>
		<item>
		<title>Taylorsville High School Expansion &#8211; October 2026 Update</title>
		<link>https://gsdfuture.org/2026/10/19/taylorsville-high-school-expansion-october-2026-update/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Mon, 19 Oct 2026 15:21:14 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[Taylorsville High]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2985</guid>

					<description><![CDATA[Construction will begin in December of 2026 on a new wing, remodeled student commons space, and other upgrades. The Taylorsville High addition and remodel will consist of approximately 48,000 new square feet with another approximately 30,000 square feet of remodeled space intended to alleviate over-crowding and use of relocatables. This includes a security vestibule which [&#8230;]]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Construction will begin in December of 2026 on a new wing, remodeled student commons space, and other upgrades. The Taylorsville High addition and remodel will consist of approximately 48,000 new square feet with another approximately 30,000 square feet of remodeled space intended to alleviate over-crowding and use of relocatables. This includes a security vestibule which opens into the new administrative offices.  A new two-story addition that will house 20 general classrooms with additional restrooms in that wing. Improvements include remodeled special education classrooms, with new dance and weight rooms in the athletic area of the building. Remodeled career and counseling center in the space that the main office currently resides. Construction is anticipated to be completed in the summer of 2029.   </p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" decoding="async" width="1024" height="301" data-attachment-id="2986" data-permalink="https://gsdfuture.org/2026/10/19/taylorsville-high-school-expansion-october-2026-update/image-250/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?fit=1908%2C560&amp;ssl=1" data-orig-size="1908,560" data-comments-opened="0" data-image-title="image" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?fit=1024%2C301&amp;ssl=1" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?resize=1024%2C301&#038;ssl=1" alt="Taylorsville Wing Addition (jpeg)" class="wp-image-2986" style="aspect-ratio:3.4098360655737703;width:624px;height:auto" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?resize=1024%2C301&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?resize=300%2C88&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?resize=767%2C225&amp;ssl=1 767w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?resize=1536%2C451&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image-1.jpeg?w=1908&amp;ssl=1 1908w" sizes="(max-width: 1000px) 100vw, 1000px" /></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2985</post-id>	</item>
		<item>
		<title>West Kearns Elementary Site &#8211; October 2026 Update</title>
		<link>https://gsdfuture.org/2026/10/19/west-kearns-elementary-site-october-2026-update/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Mon, 19 Oct 2026 15:12:09 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[West Kearns Elementary]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2982</guid>

					<description><![CDATA[Demolition of the previous school building is nearly complete. Construction on the new building will begin in January 2027 and is anticipated to run through December 2028.&#160; The design of this new school stems from the South Kearns and Olene Walker Elementary Schools. Many of the same characteristics will be present in the new building, [&#8230;]]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Demolition of the previous school building is nearly complete. Construction on the new building will begin in January 2027 and is anticipated to run through December 2028.&nbsp;</p>



<p class="wp-block-paragraph">The design of this new school stems from the South Kearns and Olene Walker Elementary Schools. Many of the same characteristics will be present in the new building, which will help the rebuild save on time and costs. The building will be a two-story structure, approximately 94,000 square feet. It will include site security fencing and a secure vestibule into the front of the school and administrative suite. The second story will house the Media Center and the teacher collaboration hub. The main level will have a small food pantry and family engagement center. There will be 36 classrooms including special education spaces in addition to a kitchen, cafeteria, gym and multipurpose space. The building is anticipated to hold a little over 800 students.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="301" data-attachment-id="2983" data-permalink="https://gsdfuture.org/2026/10/19/west-kearns-elementary-site-october-2026-update/image-249/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?fit=1908%2C560&amp;ssl=1" data-orig-size="1908,560" data-comments-opened="0" data-image-title="image" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?fit=1024%2C301&amp;ssl=1" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?resize=1024%2C301&#038;ssl=1" alt="West Kearns Rendering (jpeg)" class="wp-image-2983" style="aspect-ratio:3.4098360655737703;width:624px;height:auto" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?resize=1024%2C301&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?resize=300%2C88&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?resize=767%2C225&amp;ssl=1 767w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?resize=1536%2C451&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/10/image.jpeg?w=1908&amp;ssl=1 1908w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2982</post-id>	</item>
		<item>
		<title>Skyline High Construction Update August 2026</title>
		<link>https://gsdfuture.org/2026/08/21/skyline-high-construction-update-august-2026/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Fri, 21 Aug 2026 15:59:00 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[Skyline]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2943</guid>

					<description><![CDATA[Interior Work:&#160;​ ​ Exterior Work:​ ​ Building Compliance:​]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Interior Work:&nbsp;</strong>​</p>



<ul class="wp-block-list">
<li>Teachers were given access to set up classrooms. ​</li>



<li>Classroom desks and chairs have been installed. ​</li>



<li>Stage floor was painted and is awaiting its final coat. ​</li>



<li>Auditorium sound system installation is underway. ​</li>



<li>Auditorium carpet installation is nearly complete.​</li>
</ul>



<p class="wp-block-paragraph"><strong></strong>​</p>



<p class="wp-block-paragraph"><strong>Exterior Work:</strong>​</p>



<ul class="wp-block-list">
<li>Curb and gutter work at the main entrance iscomplete. ​</li>



<li>Road base has been placed, with asphalt pavingunderway. ​</li>



<li>Concrete sidewalks and surrounding plaza areas arecomplete.​</li>



<li>Landscaping work continues. ​</li>



<li>Preschool playground equipment and thesurrounding security fencing is complete.​</li>
</ul>



<p class="wp-block-paragraph"><strong></strong>​</p>



<p class="wp-block-paragraph"><strong>Building Compliance:</strong>​</p>



<ul class="wp-block-list">
<li>Granite School District issued a TemporaryCertificate of Occupancy to allow outside vendorsand GSD personnel in the building to perform theirremaining work.​</li>
</ul>



<figure data-carousel-extra='{&quot;blog_id&quot;:1,&quot;permalink&quot;:&quot;https://gsdfuture.org/2026/08/21/skyline-high-construction-update-august-2026/&quot;}'  class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="872" height="666" data-attachment-id="2944" data-permalink="https://gsdfuture.org/2026/08/21/skyline-high-construction-update-august-2026/screenshot-2026-08-21-at-9-59-50-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.50%E2%80%AFAM.png?fit=872%2C666&amp;ssl=1" data-orig-size="872,666" data-comments-opened="0" data-image-title="Screenshot 2026-08-21 at 9.59.50 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.50%E2%80%AFAM.png?fit=872%2C666&amp;ssl=1" data-id="2944" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.50%E2%80%AFAM.png?resize=872%2C666&#038;ssl=1" alt="Skyline bathrooms" class="wp-image-2944" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.50%E2%80%AFAM.png?w=872&amp;ssl=1 872w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.50%E2%80%AFAM.png?resize=300%2C229&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.50%E2%80%AFAM.png?resize=768%2C587&amp;ssl=1 768w" sizes="auto, (max-width: 872px) 100vw, 872px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="872" height="658" data-attachment-id="2946" data-permalink="https://gsdfuture.org/2026/08/21/skyline-high-construction-update-august-2026/screenshot-2026-08-21-at-9-59-47-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.47%E2%80%AFAM.png?fit=872%2C658&amp;ssl=1" data-orig-size="872,658" data-comments-opened="0" data-image-title="Screenshot 2026-08-21 at 9.59.47 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.47%E2%80%AFAM.png?fit=872%2C658&amp;ssl=1" data-id="2946" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.47%E2%80%AFAM.png?resize=872%2C658&#038;ssl=1" alt="Skyline interior" class="wp-image-2946" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.47%E2%80%AFAM.png?w=872&amp;ssl=1 872w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.47%E2%80%AFAM.png?resize=300%2C226&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.47%E2%80%AFAM.png?resize=768%2C580&amp;ssl=1 768w" sizes="auto, (max-width: 872px) 100vw, 872px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="890" height="668" data-attachment-id="2945" data-permalink="https://gsdfuture.org/2026/08/21/skyline-high-construction-update-august-2026/screenshot-2026-08-21-at-9-59-43-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.43%E2%80%AFAM.png?fit=890%2C668&amp;ssl=1" data-orig-size="890,668" data-comments-opened="0" data-image-title="Screenshot 2026-08-21 at 9.59.43 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.43%E2%80%AFAM.png?fit=890%2C668&amp;ssl=1" data-id="2945" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.43%E2%80%AFAM.png?resize=890%2C668&#038;ssl=1" alt="skyline exterior" class="wp-image-2945" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.43%E2%80%AFAM.png?w=890&amp;ssl=1 890w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.43%E2%80%AFAM.png?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.43%E2%80%AFAM.png?resize=768%2C576&amp;ssl=1 768w" sizes="auto, (max-width: 890px) 100vw, 890px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="884" height="656" data-attachment-id="2947" data-permalink="https://gsdfuture.org/2026/08/21/skyline-high-construction-update-august-2026/screenshot-2026-08-21-at-9-59-40-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.40%E2%80%AFAM.png?fit=884%2C656&amp;ssl=1" data-orig-size="884,656" data-comments-opened="0" data-image-title="Screenshot 2026-08-21 at 9.59.40 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.40%E2%80%AFAM.png?fit=884%2C656&amp;ssl=1" data-id="2947" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.40%E2%80%AFAM.png?resize=884%2C656&#038;ssl=1" alt="skyline exterior photos" class="wp-image-2947" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.40%E2%80%AFAM.png?w=884&amp;ssl=1 884w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.40%E2%80%AFAM.png?resize=300%2C223&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/Screenshot-2026-08-21-at-9.59.40%E2%80%AFAM.png?resize=768%2C570&amp;ssl=1 768w" sizes="auto, (max-width: 884px) 100vw, 884px" /></figure>
</figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2943</post-id>	</item>
		<item>
		<title>Construction Updates August 2026</title>
		<link>https://gsdfuture.org/2026/08/21/construction-updates-august-2026/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Fri, 21 Aug 2026 15:56:07 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2941</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<figure class="wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio"><div class="wp-block-embed__wrapper">
<iframe loading="lazy" title="Board Administrative Session Live Stream - August 4, 2026" width="500" height="281" src="https://www.youtube.com/embed/3_qD4FEsmls?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe>
</div></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2941</post-id>	</item>
		<item>
		<title>West Kearns Elementary Demolition</title>
		<link>https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Fri, 21 Aug 2026 15:53:52 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[West Kearns Elementary]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2931</guid>

					<description><![CDATA[Demolition has begun on the old West Kearns Elementary building. A new building will be constructed on the same property. Click here for more updates.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Demolition has begun on the old West Kearns Elementary building. A new building will be constructed on the same property. <a href="https://gsdfuture.org/category/project-updates/west-kearns-elementary/" target="_blank" rel="noreferrer noopener">Click here for more updates</a>. </p>



<figure data-carousel-extra='{&quot;blog_id&quot;:1,&quot;permalink&quot;:&quot;https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/&quot;}'  class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2932" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8679/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;1.78&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916131&quot;,&quot;focal_length&quot;:&quot;6.7649998656528&quot;,&quot;iso&quot;:&quot;64&quot;,&quot;shutter_speed&quot;:&quot;0.00015299877600979&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8679" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2932" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679.jpg?resize=1024%2C768&#038;ssl=1" alt="West Kearns Elementary being demolished" class="wp-image-2932" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8679-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2933" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8680/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;1.78&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916133&quot;,&quot;focal_length&quot;:&quot;6.7649998656528&quot;,&quot;iso&quot;:&quot;64&quot;,&quot;shutter_speed&quot;:&quot;0.00012700025400051&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8680" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2933" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2933" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8680-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2934" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8681/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;1.78&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916177&quot;,&quot;focal_length&quot;:&quot;6.7649998656528&quot;,&quot;iso&quot;:&quot;64&quot;,&quot;shutter_speed&quot;:&quot;0.0002440214738897&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8681" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2934" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2934" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8681-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2935" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8682/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;2.8&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916180&quot;,&quot;focal_length&quot;:&quot;16.890625&quot;,&quot;iso&quot;:&quot;50&quot;,&quot;shutter_speed&quot;:&quot;0.0018214936247723&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8682" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2935" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2935" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8682-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2936" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8683/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;1.78&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916185&quot;,&quot;focal_length&quot;:&quot;6.7649998656528&quot;,&quot;iso&quot;:&quot;100&quot;,&quot;shutter_speed&quot;:&quot;0.00077399380804954&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8683" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2936" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2936" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8683-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2937" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8684/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;1.78&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916334&quot;,&quot;focal_length&quot;:&quot;6.7649998656528&quot;,&quot;iso&quot;:&quot;80&quot;,&quot;shutter_speed&quot;:&quot;0.00038299502106473&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8684" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2937" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2937" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8684-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2938" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8685/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;1.78&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916337&quot;,&quot;focal_length&quot;:&quot;6.7649998656528&quot;,&quot;iso&quot;:&quot;64&quot;,&quot;shutter_speed&quot;:&quot;0.00032299741602067&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8685" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2938" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2938" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8685-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="2939" data-permalink="https://gsdfuture.org/2026/08/21/west-kearns-elementary-demolition/img_8686/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?fit=2560%2C1920&amp;ssl=1" data-orig-size="2560,1920" data-comments-opened="0" data-image-meta="{&quot;aperture&quot;:&quot;2.8&quot;,&quot;camera&quot;:&quot;iPhone 17 Pro Max&quot;,&quot;created_timestamp&quot;:&quot;1785916340&quot;,&quot;focal_length&quot;:&quot;16.890625&quot;,&quot;iso&quot;:&quot;50&quot;,&quot;shutter_speed&quot;:&quot;0.0015673981191223&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="IMG_8686" data-image-description="" data-image-caption="&lt;p&gt;West Kearns Elementary being demolished&lt;/p&gt;
" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?fit=1024%2C768&amp;ssl=1" data-id="2939" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686.jpg?resize=1024%2C768&#038;ssl=1" alt="" class="wp-image-2939" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?resize=1024%2C768&amp;ssl=1 1024w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?resize=768%2C576&amp;ssl=1 768w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/08/IMG_8686-scaled.jpg?resize=2048%2C1536&amp;ssl=1 2048w" sizes="auto, (max-width: 1000px) 100vw, 1000px" /><figcaption class="wp-element-caption">West Kearns Elementary being demolished</figcaption></figure>
</figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2931</post-id>	</item>
		<item>
		<title>Skyline High Update &#8211; June 2026</title>
		<link>https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Fri, 05 Jun 2026 17:52:16 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[Skyline]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2920</guid>

					<description><![CDATA[Area H (Classroom&#160;Wing):​ Area I (Black Box):​ Auditorium:​ Area J (Performing Arts Entry):​ Sitework / Demolition:​]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph"><strong>Area H (Classroom&nbsp;Wing):</strong>​</p>



<ul class="wp-block-list">
<li>Classroom A/V and electrical punch work completed.Systems are functional with only a small list of correctiveitems remaining.​</li>



<li>Countertops have been installed in the main restroomson Levels 2 and 3.​</li>



<li>Corridor LVT installation is 95% complete, withremaining punch list items in progress.​</li>



<li>Wood paneling installation is complete.​</li>



<li>Construction cleaning in all areas is ongoing.​</li>
</ul>



<p class="wp-block-paragraph"><strong>Area I (Black Box):</strong>​</p>



<ul class="wp-block-list">
<li>Black Box Theater bleachers are being installed.​</li>



<li>The Scenery Shop floor has been ground and cleaned.​</li>



<li>Cabinetry and shelving installations are complete.​</li>



<li>Construction cleaning in all areas is ongoing.​</li>
</ul>



<p class="wp-block-paragraph"><strong>Auditorium:</strong>​</p>



<ul class="wp-block-list">
<li>The Fly Loft orchestra shell has been installed, andlighting is being wired.​</li>



<li>Control booth cabinetry has been installed.​</li>



<li>Interior finish carpentry in the Auditorium is complete.​</li>



<li>Seating installation began on May 18th.​</li>
</ul>



<p class="wp-block-paragraph"><strong>Area J (Performing Arts Entry):</strong>​</p>



<ul class="wp-block-list">
<li>Entry wall graphics and display cases have beeninstalled. ​</li>
</ul>



<p class="wp-block-paragraph"><strong>Sitework / Demolition:</strong>​</p>



<ul class="wp-block-list">
<li>Building demolition and abatement have been completed.During demolition of the Auditorium, a significant amountof underground transite piping was discovered. Throughcoordination between Hughes, A1 Abatement, and GSD,the affected areas were cleared daily, allowing thedemolition contractor to remain productive on site,completing the impacted areas ahead of schedule, andkeeping the project moving forward.​</li>



<li>Storm drainage chambers are being installed, along withconnections to all storm branch lines.​</li>



<li>South-side landscaping has been installed. Over theweekend the day after the grass was installed, a vehiclewas driven through the newly landscaped area, damagingsprinkler lines, sprinkler heads, and portions of the grass.Hughes responded quickly and completed all necessaryrepairs the following week.​</li>



<li>Courtyard sprinkler installation is complete, and the area isbeing prepared for grass installation.​</li>



<li>Handrails have been installed on the stairway leading tothe Seminary Building.​</li>



<li>Courtyard fence posts have been installed.​</li>



<li>Final grading activities are ongoing in preparation forasphalt and concrete work.​</li>



<li>Site utilities are being coordinated and tied into existing infrastructure.​</li>
</ul>



<figure data-carousel-extra='{&quot;blog_id&quot;:1,&quot;permalink&quot;:&quot;https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/&quot;}'  class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="858" height="654" data-attachment-id="2900" data-permalink="https://gsdfuture.org/2026/04/29/skyline-high-update-march-2026/screenshot-2026-04-29-at-2-40-51-pm/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/04/Screenshot-2026-04-29-at-2.40.51%E2%80%AFPM.png?fit=858%2C654&amp;ssl=1" data-orig-size="858,654" data-comments-opened="0" data-image-title="Screenshot 2026-04-29 at 2.40.51 PM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/04/Screenshot-2026-04-29-at-2.40.51%E2%80%AFPM.png?fit=858%2C654&amp;ssl=1" data-id="2900" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/04/Screenshot-2026-04-29-at-2.40.51%E2%80%AFPM.png?resize=858%2C654&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2900" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/04/Screenshot-2026-04-29-at-2.40.51%E2%80%AFPM.png?w=858&amp;ssl=1 858w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/04/Screenshot-2026-04-29-at-2.40.51%E2%80%AFPM.png?resize=300%2C229&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/04/Screenshot-2026-04-29-at-2.40.51%E2%80%AFPM.png?resize=768%2C585&amp;ssl=1 768w" sizes="auto, (max-width: 858px) 100vw, 858px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="836" height="628" data-attachment-id="2922" data-permalink="https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/screenshot-2026-06-05-at-11-48-27-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.27%E2%80%AFAM.png?fit=836%2C628&amp;ssl=1" data-orig-size="836,628" data-comments-opened="0" data-image-title="Screenshot 2026-06-05 at 11.48.27 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.27%E2%80%AFAM.png?fit=836%2C628&amp;ssl=1" data-id="2922" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.27%E2%80%AFAM.png?resize=836%2C628&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2922" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.27%E2%80%AFAM.png?w=836&amp;ssl=1 836w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.27%E2%80%AFAM.png?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.27%E2%80%AFAM.png?resize=768%2C577&amp;ssl=1 768w" sizes="auto, (max-width: 836px) 100vw, 836px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="840" height="624" data-attachment-id="2923" data-permalink="https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/screenshot-2026-06-05-at-11-48-31-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.31%E2%80%AFAM.png?fit=840%2C624&amp;ssl=1" data-orig-size="840,624" data-comments-opened="0" data-image-title="Screenshot 2026-06-05 at 11.48.31 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.31%E2%80%AFAM.png?fit=840%2C624&amp;ssl=1" data-id="2923" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.31%E2%80%AFAM.png?resize=840%2C624&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2923" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.31%E2%80%AFAM.png?w=840&amp;ssl=1 840w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.31%E2%80%AFAM.png?resize=300%2C223&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.31%E2%80%AFAM.png?resize=768%2C571&amp;ssl=1 768w" sizes="auto, (max-width: 840px) 100vw, 840px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="840" height="630" data-attachment-id="2924" data-permalink="https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/screenshot-2026-06-05-at-11-48-38-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.38%E2%80%AFAM.png?fit=840%2C630&amp;ssl=1" data-orig-size="840,630" data-comments-opened="0" data-image-title="Screenshot 2026-06-05 at 11.48.38 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.38%E2%80%AFAM.png?fit=840%2C630&amp;ssl=1" data-id="2924" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.38%E2%80%AFAM.png?resize=840%2C630&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2924" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.38%E2%80%AFAM.png?w=840&amp;ssl=1 840w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.38%E2%80%AFAM.png?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.38%E2%80%AFAM.png?resize=768%2C576&amp;ssl=1 768w" sizes="auto, (max-width: 840px) 100vw, 840px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="834" height="614" data-attachment-id="2926" data-permalink="https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/screenshot-2026-06-05-at-11-48-56-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.56%E2%80%AFAM.png?fit=834%2C614&amp;ssl=1" data-orig-size="834,614" data-comments-opened="0" data-image-title="Screenshot 2026-06-05 at 11.48.56 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.56%E2%80%AFAM.png?fit=834%2C614&amp;ssl=1" data-id="2926" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.56%E2%80%AFAM.png?resize=834%2C614&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2926" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.56%E2%80%AFAM.png?w=834&amp;ssl=1 834w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.56%E2%80%AFAM.png?resize=300%2C221&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.48.56%E2%80%AFAM.png?resize=768%2C565&amp;ssl=1 768w" sizes="auto, (max-width: 834px) 100vw, 834px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="840" height="624" data-attachment-id="2927" data-permalink="https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/screenshot-2026-06-05-at-11-49-03-am/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.03%E2%80%AFAM.png?fit=840%2C624&amp;ssl=1" data-orig-size="840,624" data-comments-opened="0" data-image-title="Screenshot 2026-06-05 at 11.49.03 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.03%E2%80%AFAM.png?fit=840%2C624&amp;ssl=1" data-id="2927" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.03%E2%80%AFAM.png?resize=840%2C624&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2927" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.03%E2%80%AFAM.png?w=840&amp;ssl=1 840w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.03%E2%80%AFAM.png?resize=300%2C223&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.03%E2%80%AFAM.png?resize=768%2C571&amp;ssl=1 768w" sizes="auto, (max-width: 840px) 100vw, 840px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="842" height="622" data-attachment-id="2928" data-permalink="https://gsdfuture.org/2026/06/05/skyline-high-update-june-2026/screenshot-2026-06-05-at-11-49-11-am-2/" data-orig-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.11%E2%80%AFAM-1.png?fit=842%2C622&amp;ssl=1" data-orig-size="842,622" data-comments-opened="0" data-image-title="Screenshot 2026-06-05 at 11.49.11 AM" data-image-description="" data-image-caption="" data-large-file="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.11%E2%80%AFAM-1.png?fit=842%2C622&amp;ssl=1" data-id="2928" src="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.11%E2%80%AFAM-1.png?resize=842%2C622&#038;ssl=1" alt="Skyline progress (jpg)" class="wp-image-2928" srcset="https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.11%E2%80%AFAM-1.png?w=842&amp;ssl=1 842w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.11%E2%80%AFAM-1.png?resize=300%2C222&amp;ssl=1 300w, https://i0.wp.com/gsdfuture.org/wp-content/uploads/2026/06/Screenshot-2026-06-05-at-11.49.11%E2%80%AFAM-1.png?resize=768%2C567&amp;ssl=1 768w" sizes="auto, (max-width: 842px) 100vw, 842px" /></figure>
</figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2920</post-id>	</item>
		<item>
		<title>Construction Updates June 2026</title>
		<link>https://gsdfuture.org/2026/06/05/construction-updates-june-2026/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Fri, 05 Jun 2026 17:43:37 +0000</pubDate>
				<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[West Kearns Elementary]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2918</guid>

					<description><![CDATA[At the June 2, 2026 Board of Education meeting, a capitol and construction update was presented to the board. Click here to view the slides from the presentation, and a recording is available below.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">At the June 2, 2026 Board of Education meeting, a capitol and construction update was presented to the board. <a href="https://meetings.boardbook.org/Documents/FileViewerOrPublic/2744?file=7d6475be-b33d-4b48-a7dd-51f08b2c803e" target="_blank" rel="noreferrer noopener">Click here to view the slides from the presentation</a>, and a recording is available below. </p>



<figure class="wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio"><div class="wp-block-embed__wrapper">
<iframe loading="lazy" title="Administrative Session Live Stream - June 2, 2026" width="500" height="281" src="https://www.youtube.com/embed/A5moBr-H6Q0?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe>
</div></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2918</post-id>	</item>
		<item>
		<title>West Kearns Elementary Rebuild Meeting</title>
		<link>https://gsdfuture.org/2026/05/13/west-kearns-elementary-rebuild-meeting/</link>
		
		<dc:creator><![CDATA[Luke Allen]]></dc:creator>
		<pubDate>Wed, 13 May 2026 16:07:54 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[West Kearns Elementary]]></category>
		<guid isPermaLink="false">https://gsdfuture.org/?p=2909</guid>

					<description><![CDATA[On May 6, 2025, District and School leadership held an rebuild information meeting with the West Kearns Community. Please see a recording of the video below, and click here for a copy of the presentation slides.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">On May 6, 2025, District and School leadership held an rebuild information meeting with the West Kearns Community. Please see a recording of the video below, and <a href="https://drive.google.com/file/d/1joQTK40RhZC6gl7mgQd0Px8KvUirQArJ/view?usp=sharing" target="_blank" rel="noreferrer noopener">click here for a copy of the presentation slides</a>. </p>



<figure class="wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio"><div class="wp-block-embed__wrapper">
<iframe loading="lazy" class="youtube-player" width="640" height="360" src="https://www.youtube.com/embed/vpJgJrByeyc?version=3&#038;rel=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;fs=1&#038;hl=en-US&#038;autohide=2&#038;wmode=transparent" allowfullscreen="true" style="border:0;" sandbox="allow-scripts allow-same-origin allow-popups allow-presentation allow-popups-to-escape-sandbox"></iframe>
</div></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2909</post-id>	</item>
	</channel>
</rss>
